British Rail Class 378
Capitalstar
The interior of a Class 378 unit
In service29 July 2009 – present
ManufacturerBombardier Transportation
Built atDerby Litchurch Lane Works
Family nameElectrostar
Replaced
Constructed
  • 2008–2011
  • (plus additional vehicles in 2015)
Number built57
SuccessorClass 710[a]
Formation
  • 5 cars per unit:
  • DMOS-MOS-PTOS-MOS-DMOS
Fleet numbers
  • 378135–378154
  • 378201–378224
  • 378225–378234
  • 378255–378257
Capacity
  • 1,178
  • (186 fixed seats, 86 tip-up seats, and up to 906 standees)
OwnersQW Rail Leasing[1]
OperatorsLondon Overground
Lines served
Specifications
Car body construction
  • Welded aluminium underframe, bodysides, and roof, and steel cab ends
Train length101.350 m (332 ft 6.2 in)
Car length
  • DMOS: 19.995 m (65 ft 7.2 in)
  • Others: 19.660 m (64 ft 6.0 in)
Width2.800 m (9 ft 2.2 in)
Height3.774 m (12 ft 4.6 in)
Floor height1.151 m (3 ft 9.3 in)[2]
Doors
  • Double-leaf pocket sliding, each 1.5 m (4 ft 11 in) wide
  • (2 per side per car)
Wheel diameter840 mm (2 ft 9 in) (nominal)[2]
Wheelbase
  • Over bogies:
  • 2.600 m (8 ft 6.4 in)
  • Over bogie centres:
  • 14.173 m (46 ft 6.0 in)
Maximum speed75 mph (121 km/h)
Weight
  • DMOS: 45.5 t (44.8 long tons; 50.2 short tons)
  • MOS: 41.1 t (40.5 long tons; 45.3 short tons)
  • PTOS: 39.9 t (39.3 long tons; 44.0 short tons)
  • Total: 212.8 t (209.4 long tons; 234.6 short tons)
Steep gradient1 in 29[2]
Traction motors3 per motor car, each of 600 kW (800 hp)
Power output2,400 kW (3,200 hp)[2]
Electric system(s)
Current collector(s)
Bogies
  • Powered: Bombardier P3-25
  • Unpowered: Bombardier T3-25
Braking system(s)
Safety system(s)
Coupling systemDellner 12
Multiple workingWithin class, and with Classes 375, 376, 377, and 379
SeatingLongitudinal
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from[3] and[4] unless otherwise noted.

The British Rail Class 378 Capitalstar[5] is an electric multiple unit passenger train specifically designed for the London Overground network. It is part of Bombardier Transportation's Electrostar family. A total of 57 five-car trains have been built – most of which were originally built as three- or four-car units.

The Class 378s were ordered in August 2006 in response to passenger dissatisfaction with existing mass-transit trains operated by Silverlink, such as the ageing fleet of Class 313. The procurement of a modern replacement was viewed as yielding better performance than the refurbishment of the existing units. Accordingly, a total of 57 Class 378s were manufactured at Bombardier's Derby site, the first example of which entered revenue service during July 2009. The type's introduction was roughly half a year later than originally planned, largely as a result of difficulties with multiple suppliers.

In design terms the train is broadly similar to the Class 376 trains operated by Southeastern, featuring the same wider metro-style sliding pocket doors for more efficient boarding and alighting. However, it also has significant differences from the Class 376, such as fully longitudinal seating similar to that used on London Underground rolling stock to give more standing and less seating capacity and reduce overcrowding, the interior having been optimised for the high-volume metro-style services being operated by London Overground.

History

London Overground Class 313 and Class 378 side by side at Richmond

By the start of the twenty-first century, several types of rolling stock that had originally entered service multiple decades before were in operation across London. In particular, the Silverlink franchise on the North London line was frequently regarded by travellers as having offered a poor service,[6] complaints centering around extremely congested trains and unreliable service.[7] The Class 313 was being used for these services at this time; its interiors were of noticeably lower quality compared to that of newer trains, and the trains themselves were viewed as unwelcoming to passengers, particularly during late hours.[8] Officials at Transport for London (TfL) were motivated to improve the situation and decided on a modern replacement for the Class 313. Accordingly, they began to investigate various options for doing so.[8]

In August 2006 it was announced that a contract worth £223 million had been signed between rolling-stock manufacturer Bombardier and TfL, under which an initial batch of 152 individual cars would be supplied, deliveries of which were to start in September 2008. The original contract contained an option to purchase additional cars, up to a total of 216. Maintenance arrangements were also included, involving the construction of a new depot near New Cross Gate station to perform heavy maintenance tasks upon this new fleet.[9] The new fleet, designated Class 378, was manufactured by Bombardier at its facility in Derby.[8]

In July 2007, TfL announced it had ordered a further 36 Capitalstar carriages for £36 million.[10] The order comprised three additional four-car units for the East London Line, and 24 additional carriages to extend the original 3-car units for the North London Line into 4-car units, to be delivered in 2011.[11]

On 16 September 2008, the first complete unit was unveiled and began testing on Bombardier's test track before being delivered for testing on the national network.[11] On the first public unveiling of the Class 378, TfL announced that it had reached an agreement to procure a further three dual-voltage units, taking the total number to 57. These units were intended to enhance the fleet once the South London line was brought under London Overground's control.[12]

In February 2013, approval was gained for the procurement of 57 additional vehicles, allowing the whole Class 378 fleet to be lengthened from four to five cars for greater capacity.[13] At the time, TfL's Business Plan called for five-car services to begin on the East London line from November 2014, while the rest of the electrified Overground network would follow by the end of 2015.[14][15] In January 2016, TfL announced that all units were now in a five-car configuration.[16]

Design and features

The Class 378 Capitalstar is a dual-voltage electric multiple-unit train (EMU), designed to be supplied via either the 750 V DC third rail or the 25 kV 50 Hz AC overhead lines.[8] It is a customised version of Bombardier's Electrostar family, aimed at the short-distance mass-transit end of the market. Early on, the trains were delivered in a three-car configuration, but were subsequently increased to a four-car formation via the addition of a single Motor Standard Open (MSO) vehicle to each set.[8]

The interior of the train was designed to maximise passenger capacity. Traditional seating was eliminated and longitudal seats adopted instead, along with wide areas around the doors to speed the entrance and exit of passengers.[8] Furthermore, a significant portion of each car is intended for use by standing passengers, and thus have grabrails and other holding points for such passengers to steady themselves, broadly similar to a London Underground tube train. The trains lack toilets, as the whole NLL line takes a little more than one hour to traverse from end to end.[8][4] In conjunction with the base internal configuration, the cars were outfitted with numerous modern amenities aimed at improving passenger comfort, such as air conditioning, real-time passenger information systems, wheelchair accessibility (including the facilitating of level access), and different seat moquette colours to highlight priority seating.[8][11]

The train is equipped with sensors to detect how many people are in each coach, and automatically adjust how much energy is expended on heating a particular carriage based upon this capacity, among other intelligent management functions that are performed.[8] External CCTV is displayed automatically on releasing the doors via an in-cab monitor, removing the need for Driver-Only Operation (DOO) equipment such as monitors/mirrors at platforms. A somewhat similar arrangement to this had already come into use on Southern's Electrostar units. Furthermore, in the event of a passenger operating an emergency alarm, the internal CCTV is automatically displayed on the in-cab monitor, allowing the driver to view the affected area of the train, while an intercom allows the driver to speak to the passenger.[4]

Formation

Units numbered in the range 378135–378154 consist of vehicles:

Units numbered in the range 378201–378234 and 378255–378257 consist of vehicles:

Operations

The Class 378 was originally intended to enter service in January 2009. This schedule was delayed by seven months as a consequence of the great recession of 2008, which had forced several suppliers into bankruptcy, resulting in a shortage of several components.[17] This also affected delivery of the similar Class 377/5 units to First Capital Connect. As a result, the first Class 378 unit did not enter service until 29 July 2009.[12]

Class 378 approaching Hoxton, with City of London skyline beyond

During 2011, several Class 378s suffered unplanned shutdowns while operating along the North London Line. The cause was found to be harmonic interference generated by passing Class 92 locomotives, which occasionally traverse the line for freight movements. The problem was permanently resolved after Bombardier altered the interference tolerance settings.[18]

During January 2016, TfL announced the completion for work to extend all 57 units into a five-car configuration.[16] In December 2018, unit 378232 was shortened back to four cars to run on the Gospel Oak to Barking line while delays to delivery of Class 710 were resolved. 378206 and 378209 were also shortened to four carriages to work as temporary cover while the diesel-powered Class 172s were withdrawn.[19][20]

In July 2015, London Overground announced an order for 45 new Class 710 units, some of which would displace the Class 378s in use on the Watford DC line. These displaced units will then be cascaded to strengthen services on the other lines the units are used on.[21] Three years later, London Overground began a programme to refresh the Class 378 fleet, giving them a livery and moquette similar to that of the newer Class 710 fleet.[22]

During January 2018, the Class 378 fleet was temporarily withdrawn from service for urgent safety inspections after one unit suffered a failed brake caliper.[23]

Fleet

Class 378 awaiting departure at Richmond

The Class 378 fleet is currently formed of two separate subclasses, DC-only 378/1 and dual-voltage (AC and DC) Class 378/2:

Class Operator Routes No. built Year built Cars per unit Unit nos. Notes
378/1 London Overground 20 2009–2010 5 378135–378154 Third-rail only.
378/2 24 2008–2010 378201–378224 Dual-voltage units. Originally built as three-car Class 378/0 (378001–378024).
13 2010–2011 378225–378234, 378255–378257 Dual-voltage units.
Illustration of a London Overground Class 378/1 unit

Named units

Named units are as follows:[25]

See also

Notes

References

  1. ^ Review 2023. Modern Railways. 2023. pp. 18–19. ISBN 978-1-80282-5695.
  2. ^ a b c d e Jacob, Gemma (17 August 2016). "London Overground Class 378 Details". Letter to Adam Palfrey. Transport for London. Retrieved 1 October 2022.
  3. ^ Hall, Peter (February 2012). British Railways Locomotives & Coaching Stock 2012. Sheffield: Platform 5. p. 292. ISBN 9781902336923.
  4. ^ a b c Class 378 Information Sheet (PDF) (1 ed.). Transport for London. 2 November 2018. Retrieved 13 December 2020.
  5. ^ Pritchard, R. (November 2008). "TfL's first Class 378 ready to roll!". Today's Railways UK. Sheffield. p. 32.
  6. ^ Sharp, Rachel (24 October 2007). "TfL to take on rail network". Ealing Times. Archived from the original on 13 January 2008. Retrieved 26 October 2007.
  7. ^ "Braced for rail strikes". Hackney Gazette. 26 October 2007. Archived from the original on 28 November 2007. Retrieved 30 January 2021.
  8. ^ a b c d e f g h i Clinnick, Richard (30 December 2009). "A benchmark for inner suburban trains". Rail. Peterborough.
  9. ^ "Bombardier Wins A£223 Million Order From Transport For London For 152 Electric Multiple Unit Cars for the United Kingdom" (Press release). Bombardier Transportation. 31 August 2006. Archived from the original on 1 March 2014.
  10. ^ "£36m contract to bring extra rail carriages for London Overground" (Press release). Transport for London. 4 July 2007. Archived from the original on 1 October 2012.
  11. ^ a b c "New London Overground Class 378s take shape at Derby" (PDF). Railway Herald. Scunthorpe. 22 September 2008. p. 4,5.
  12. ^ a b Morrison, Brian (August 2009). "Mayor rides Class 378 – TfL orders three more". Modern Railways. London. p. 8.
  13. ^ "London Overground train lengthening approved". Railway Gazette. London. 7 February 2013. Retrieved 24 December 2013.
  14. ^ Turvill, Bill (March 2013). "London Overground goes for five cars". Modern Railways. p. 88.
  15. ^ "London Overground capacity". Transport for London. Archived from the original on 26 May 2015.
  16. ^ a b "Five-car '378s' boost LO capacity". Rail. Peterborough. January 2016.
  17. ^ "London Overground Class 378 ready to enter service". Railway Gazette. London. 14 July 2009.
  18. ^ "Class 92 shuts down 378s – solution found". Modern Railways. No. 750. London. March 2011. p. 9.
  19. ^ "Modified electric trains to be used temporarily on London Overground's Gospel Oak to Barking line" (Press release). Transport for London. 25 January 2019. Retrieved 26 January 2019.
  20. ^ Clinnick, Richard (9 February 2020). "New trains… but often the same old problems". Rail. Peterborough.
  21. ^ Sadler, Katie (3 July 2015). "Bombardier to supply and maintain 180 AVENTRA vehicles for London Overground". European Railway Review. Retrieved 15 September 2015.
  22. ^ Christie, Tony (December 2018). "Stock Changes". Today's Railways. No. 204. Sheffield. p. 75.
  23. ^ Holden, Michael (13 January 2018). "Safety Concerns Ground London Overground 378 Trains". railadvent.co.uk.
  24. ^ "London Overground Clapham Junction to Surrey Quays". Transport for London. Projects and schemes. 2010. Archived from the original on 7 September 2012. Retrieved 19 July 2012.
  25. ^ Pritchard, Robert (2020). Electric multiple units 2021 : including multiple unit formations & EMUs in industrial service (34th (2021) ed.). Sheffield: Platform 5 Books. p. 61. ISBN 9781909431645.
  26. ^ "Stock Update". The Railway Magazine. No. 1455. June 2022. p. 85.
  27. ^ "Depot Talk". Rail Express. No. 314. July 2022. p. 28.