Expressway in Poland connecting Piotrków Trybunalski, Kielce, Sandomierz and Nisko
.mw-parser-output .hidden-begin{box-sizing:border-box;width:100%;padding:5px;border:none;font-size:95%}.mw-parser-output .hidden-title{font-weight:bold;line-height:1.6;text-align:left}.mw-parser-output .hidden-content{text-align:left}@media all and (max-width:500px){.mw-parser-output .hidden-begin{width:auto!important;clear:none!important;float:none!important))You can help expand this article with text translated from
the corresponding article in Polish. Click [show] for important translation instructions.
Machine translation, like
DeepL or
Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide
copyright attribution in the
edit summary accompanying your translation by providing an
interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Polish Wikipedia article at [[:pl:Droga ekspresowa S74 (Polska)]]; see its history for attribution.
You should also add the template ((Translated|pl|Droga ekspresowa S74 (Polska))) to the
talk page.
For more guidance, see
Wikipedia:Translation.
Expressway S74 or express road S74 is planned Polish highway connecting express road S12 near Sulejów and S19 near Nisko. From Opatów it is going to follow the current national road 74 toward Lipnik (where it's going to cross national road 9) and further is going to follow national road 77 toward express road S19 near Nisko.
Most of this road is still in planning stages and the exact route has not been established. The construction of the first 6.9 km (4.3 mi) long section near Kielce began in May 2009, and was finished in December 2011. The road is planned to be fully completed in 2030.[1]