Kalena Agrahara
Namma Metro station
Under Construction of Kalena Agrahara metro station
General information
Other namesGottigere
LocationMantri Residency Rd, near Sri Meenakshi Sundareshwara Temple, Classic Orchards Layout, Kalena Agrahara, Bengaluru, Karnataka 560076
Coordinates12°52′18″N 77°35′37″E / 12.87158°N 77.59363°E / 12.87158; 77.59363
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsSide platform (TBC)
Platform-1 → Train Terminates Here
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningMarch 2025; 11 months' time (March 2025) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Terminus Pink Line
(Future Service)
Hulimavu
towards Nagawara
Location
Map

Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon (Bannerghatta Road). This metro station is stated to become operational around Q4 of 2024 / March 2025.[2][3][4][5][6]

Station layout

Station Layout - To Be Confirmed [7]

Kalena Agrahara track layout (TBC)
P#
P#
to Train Terminates Here
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Train Terminates Here
Platform #
Northbound
Towards ← Nagawara next station is Hulimavu
Side platform | Doors will open on the left Disabled access
L2

Connections

This section is empty. You can help by adding to it. (December 2023)

Entry/Exit

This section is empty. You can help by adding to it. (December 2023)

See also

References

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  3. ^ "Namma Bengaluru's Pink Line likely to commence commercial operations by March 2025! Check routes, stoppages, and more". Financialexpress. 18 July 2023. Retrieved 15 December 2023.
  4. ^ Staff Reporter (17 July 2023). "Bengaluru Metro: Pink Line likely to be Operationalised by March 2025". Metro Rail News. Retrieved 15 December 2023.
  5. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  6. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  7. ^ "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.