CC7 
Mountbatten MRT Station
蒙巴登地铁站
மவுண்ட்பேட்டன்
Stesen MRT Mountbatten
Rapid transit
Platform level of Mountbatten MRT station.
General information
Location301 Mountbatten Road
Singapore 398006
Coordinates1°18′23″N 103°52′57″E / 1.306306°N 103.882531°E / 1.306306; 103.882531
Operated bySMRT Trains (SMRT Corporation)
Line(s)
PlatformsIsland
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeUnderground
Platform levels2
AccessibleYes
Other information
Station code CC7 
History
Opened17 April 2010
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT stations
toward Template:SMRT stations
Template:SMRT lines
Template:SMRT stations
toward Template:SMRT stations

Mountbatten MRT Station (CC7) is an underground Mass Rapid Transit station on the Circle Line in Singapore.

History

It is named after 1st Earl Mountbatten of Burma, the Supreme Allied Commander (Southeast Asia) who accepted the Japanese surrender of Singapore during the Second World War. The station is served by two exit and entry points. The station was opened on 17 April 2010 along with the rest of Stage 1 & 2 of the Circle Line.

The contractor in charge of building this station was Nishimatsu-Lum Chang joint venture, the same joint venture that was in charge of the Nicoll Highway station.

The alignment of the underground Kallang-Paya Lebar Expressway intersects with the alignment of the railway tunnels of the Circle Line between Mountbatten and Stadium. It posed a construction challenge as both were constructed at the same time.

It is near to Kallang and Stadium and serves the town of Kallang and Old Kallang Airport estate.

Station layout

L1 Street Level Mountbatten Square
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter
B2 Platform A Template:SMRT lines towards  CC29  NE1  HarbourFront via  CC8  Template:SMRT stations (→)
Island platform, doors will open on the right
Platform B Template:SMRT lines towards  CC1  NS24  NE6  Dhoby Ghaut via  CC6  Template:SMRT stations (←)

Exits

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
colspan="7" style="background-color:#Template:SMRT color;color:white; height:25px" | Circle Line
to CC1 Dhoby Ghaut 5.44am 6.11am 11.53pm
to CC29 HarbourFront 5.35am 6.03am 11.00pm
to CC26 Pasir Panjang 11.30pm
to CC23 one-north 11.46pm
to CC17 Caldecott 12.14am
to CC11 Tai Seng 12.22am

References