CC7 Mountbatten MRT Station 蒙巴登地铁站 மவுண்ட்பேட்டன் Stesen MRT Mountbatten | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
General information | |||||||||||
Location | 301 Mountbatten Road Singapore 398006 | ||||||||||
Coordinates | 1°18′23″N 103°52′57″E / 1.306306°N 103.882531°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | CC7 | ||||||||||
History | |||||||||||
Opened | 17 April 2010 | ||||||||||
Services | |||||||||||
|
Mountbatten MRT Station (CC7) is an underground Mass Rapid Transit station on the Circle Line in Singapore.
It is named after 1st Earl Mountbatten of Burma, the Supreme Allied Commander (Southeast Asia) who accepted the Japanese surrender of Singapore during the Second World War. The station is served by two exit and entry points. The station was opened on 17 April 2010 along with the rest of Stage 1 & 2 of the Circle Line.
The contractor in charge of building this station was Nishimatsu-Lum Chang joint venture, the same joint venture that was in charge of the Nicoll Highway station.
The alignment of the underground Kallang-Paya Lebar Expressway intersects with the alignment of the railway tunnels of the Circle Line between Mountbatten and Stadium. It posed a construction challenge as both were constructed at the same time.
It is near to Kallang and Stadium and serves the town of Kallang and Old Kallang Airport estate.
L1 | Street Level | Mountbatten Square |
B1 | Concourse | Faregates, Ticketing Machines, Station Control, Transitlink Counter |
B2 | Platform A | Template:SMRT lines towards CC29 NE1 HarbourFront via CC8 Template:SMRT stations (→) |
Island platform, doors will open on the right | ||
Platform B | Template:SMRT lines towards CC1 NS24 NE6 Dhoby Ghaut via CC6 Template:SMRT stations (←) |
Destination | First Train | Last Train | |||
---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday |
Daily | |||
colspan="7" style="background-color:#Template:SMRT color;color:white; height:25px" | Circle Line | |||||
to CC1 Dhoby Ghaut | 5.44am | 6.11am | 11.53pm | ||
to CC29 HarbourFront | 5.35am | 6.03am | 11.00pm | ||
to CC26 Pasir Panjang | – | – | 11.30pm | ||
to CC23 one-north | – | – | 11.46pm | ||
to CC17 Caldecott | – | – | 12.14am | ||
to CC11 Tai Seng | – | – | 12.22am |