This article uses bare URLs, which are uninformative and vulnerable to link rot. Please consider converting them to full citations to ensure the article remains verifiable and maintains a consistent citation style. Several templates and tools are available to assist in formatting, such as reFill (documentation) and Citation bot (documentation). (September 2022) (Learn how and when to remove this template message)
Sawankhalok Line
Overview
StatusOperational
OwnerState Railway of Thailand
LocaleUttaradit Province, and Sukhothai Province
Termini
Stations3
Service
TypeInter-city rail
SystemState Railway of Thailand
Operator(s)SRT
Depot(s)Uttaradit Depot
Rolling stockBritish Rail Class 158 3 cars per train
History
Opened15 August 1910 (1910-08-15)
Technical
Line length28.8 km (17.9 mi)
Track gauge1,000 mm (3 ft 3+38 in) metre gauge

The Sawankhalok Line is a branch railway line which splits from Chiang Mai Main Line at Ban Dara Junction, and ends at Sawankhalok. There are three stations on the line: Ban Dara Junction, Khlong Maphlap, Sawankhalok.

History

Timeline

No. Segment Year opened[1]
1 Ban Dara JunctionSawankhalok 1910

Services

Train no. Type Termini
3 Limited Express Hua Lamphong Sawankhalok

Stations

English Name Thai Name Code Distance
in km
Class Thai abbr. Note Location
Ban Dara บ้านดารา 1137 458.31 3 ดร. Uttaradit
Khlong Lamung คลองละมุง 1138 466.32 Halt Closed
Khlong Maphlap คลองมะพลับ 1139 470.27 3 มป. Sukhothai
Wat Khlong Pu วัดคลองปู 1140 474.96 Halt Closed
Khlong Yang คลองยาง 1141 479.03 Halt Closed
Nong Riang (Nong Wiang)[2] หนองเรียง 1142 483.08 Halt Closed
Sawankhalok สวรรคโลก 1143 487.14 3 สว.

See also

References

  1. ^ http://portal.rotfaithai.com/modules.php?name=Content&pa=showpage&pid=17
  2. ^ "Stations of the Northern Line". Geo Cities. Retrieved 19 June 2017.