Taipingling Nuclear Power Plant | |
---|---|
Country | People's Republic of China |
Location | Huangbu, Huidong, Guangdong |
Coordinates | 22°41′40″N 114°59′00″E / 22.69444°N 114.98333°E |
Status | Under construction |
Construction began | 2019 |
Owner(s) | CGN Huizhou Nuclear Power |
Operator(s) | CGN Huizhou Nuclear Power |
Nuclear power station | |
Reactor type | Hualong One PWR |
Power generation | |
Units planned | 4 × 1200 MW |
Units under const. | 2 × 1200 MW |
The Taipingling Nuclear Power Plant is a nuclear power station under construction in Huangbu Town, Huidong County, Huizhou city on the coast of Guangdong Province, in southeast China. The plant is owned by CGN Huizhou Nuclear Power Co. CGN originally planned to have AP1000 light water reactors, but later changed plans to the Hualong One design.[1]
Approval for the plant was granted in February 2019 and first concrete for Unit 1 was poured in December 2019.
Approval for units 3 and 4 was granted in December 2023.[2]
Unit | Type | Gross Capacity | Construction start | Operation start | Notes |
---|---|---|---|---|---|
Phase I | |||||
Taipingling 1 | Hualong One | 1200 MW | 26 Dec 2019 | 2025 (planned) | [3] |
Taipingling 2 | Hualong One | 1200 MW | 15 Oct 2020 | 2026 (planned) | [4] |
Phase II | |||||
Taipingling 3 | Hualong One | ||||
Taipingling 4 | Hualong One | ||||
Phase III | |||||
Taipingling 5 | Hualong One | ||||
Taipingling 6 | Hualong One |
Operating power plants | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Power plants under construction | |||||||||||
Planned power plants | |||||||||||
Proposed power plants | |||||||||||
Research, experimental and prototype reactors | |||||||||||
Commercial reactor designs | |||||||||||
Organizations |
| ||||||||||
Related categories | |||||||||||