Kilombero Bridge Daraja la Kilombero (Swahili) | |
---|---|
Coordinates | 8°11′22.46″S 36°41′36.68″E / 8.1895722°S 36.6935222°E |
Carries | 2 lanes |
Crosses | Ulanga River |
Locale | 5 km south of Ifakara, Tanzania |
Owner | Government of Tanzania |
Characteristics | |
Total length | 384 metres (1,260 ft) |
Width | 11.3 metres (37 ft) |
History | |
Engineering design by | NIMETA Consult (T) Ltd & Howard Humphreys (Tanzania) Ltd |
Constructed by | China Railway 15th Bureau Group Corporation Consultant Engineer = aarvee associates in partnership with AES |
Construction start | November 2012 |
Construction end | February 2017 |
Construction cost | TZS 53.7 billion |
Location | |
Kilombero Bridge is a bridge connecting in Kilombero District and Ulanga District of Morogoro Region in Tanzania. It is the longest bridge in Morogoro Region crossing the Ulanga River. [1]
It links the towns of Ifakara and Mahenge. Construction work began in November 2012 and was completed in February 2017.[2]
International | |
---|---|
Local | |
Under construction |