There are many architectural projects under construction in Belgrade, Serbia. Since 2002, Belgrade has experienced a major construction boom. These are only some of the projects under construction in Belgrade:[1]
Under construction
Residential, office and retail projects:
- Airport City Belgrade Under construction is one 14-story building with underground garages. Three new buildings including one Crowne Plaza hotel will start in 2020. Airport Garden residential buildings started in 2019.
- Wellport Belgrade Condominium project started in 2018. Estimated cost is 130 million Euros.[2]
- Savada 3 New residential project in New Belgrade.
- Zep Terra Mixed use project by Zepter International. It will have 75k sqm of residential and 20k sqm of office space.
- Sakura Park Belgrade 228 apartments
- New Minel Project will have 120.000 sq meters of residential space. Investment estimated apx 100 million euros.
- Exing Home 65 Residential project of 24.000 sq meters.
- Park 11 Residential project by Energoprojekt.
- BLOK 23 Office Project of 50.000 sqm of premium office space in Block 23. After 8 years on hold, new owner finishing project.
- Tempo Tower business and residential project of 112,000 sq meters and 120 meters tall.[3]
- Belgrade Waterfront One of the biggest construction projects in Europe with an estimated investment of 3,5 billion Euros.
- Belgrade Skyline 200 million euro project. three towers with height of 132m,120m and 102m. Started in 2017.
- Dorcol Centar New residential project in Cara Dusana street.
- K-District New Office-RESIDENTIAL project in oldest part of the city. Next to city Zoo and Kalemegden fortress. Investment 90 million Euros.
- Kneza Milosa Residence 150 million Euros for new residential block in Kneza Milosa st, on the place of former US Embassy.
- New Dorcol Residential project of 100.000 sq meters in Lower Dorcol.
Other parts of the city
- Vila Banjica 280,000 sqm new gated residential project.[4]
- Vozdova Kapija Residential Condo Project of 170 million euros. Project started in 2017.
- Zemunske Kapije Business and residential Project.
- East Side Complex 34.000 sqm residential project.
- Big Residences Total investment of 200 million euros under construction next to the Big shopping mall. Almost 1100 apartments will be constructed with 2200 parking spots. First phase of shopping area is opened in December 2019.[5]
- IKEA Retail Center Additional Center next to the IKEA Istok. Will have 40.000 sq.m and will cost 70 million Euros.
Transportation, medical and infrastructural projects
- Belgrade Metro Two lines of total 42 km under construction. First line will be open in 2028, second in 2030. Total cost 9bn Euros.
- Belgrade bypass New Orlovaca, Batajnica interchange and connection to Bubanj Potok bypass with new interchange is under construction.
- Belgrade Centre railway station a mega-project that's scheduled to begin in September 2020, resulting in relocation of the main railway station and its railway tracks, which will consequently free up building space in Belgrade's inner centre. The entire project is worth an estimated 2 billion US dollars, and is scheduled to be completed within a decade. The Serbian company Energoproject will invest €200 million. Already invested over a billion dollars.
- Makis 2 Water production facility.
- Tirsova 2 New children hospital under constriction next to Tirsova 1 hospital. Construction scheduled for 2020. 75 million Euros.
- Interceptor Collector Sewer system collector under construction. Estimate cost 500 million $.
- Belgrade-Budapest High speed railroad Construction started in 2017.
- Vinca Waste Management and Bioenergy Plant Construction started in 2017. Project worth 300 million Euros and managed by Vinci SA.
- Heating System Pipe Connection between Nikola Tesla Power Plant and Heating Plant New BelgradeInvestment 190 million Euros from Power Construction Corporation of China. Starts in 2018.
- Cleaning Sewer Water Plant Veliko Selo with additional interceptor. Power Construction Corporation of China is contractor. Investment 385 million euros in Phase 1. Started in 2018.
- Belgrade Nikola Tesla Airport expansion by Vinci SA worth of 770 million Euros.
- Clinical Centre of Serbia Upgrade and expansion of main building. Started in late 2018. Project cost 110 million Euros.
- Belgrade Bus Station New BAS station is under construction in New Belgrade. Construction started in 2019. Old main station is demolished in Old town.
- New Belgrade Railway Station is under expanding reconstruction.