Agra Metro | |||
---|---|---|---|
Overview | |||
Owner | Uttar Pradesh Metro Rail Corporation | ||
Area served | Agra | ||
Locale | Agra, Uttar Pradesh | ||
Transit type | Rapid transit | ||
Number of lines | 2 | ||
Line number |
| ||
Number of stations | 27 (Phase 1) 6 (priority corridor) | ||
Website | www | ||
Operation | |||
Began operation | March 6, 2024 | ||
Character | Elevated & Underground | ||
Train length | 3 Coaches | ||
Technical | |||
System length | 29.65 km (Phase-1) 7.0 km (priority corridor) [1] | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 750 V DC third rail | ||
Average speed | 34.0 km/h (21.1 mph)[2][3] | ||
Top speed | 90 km/h (56 mph) | ||
|
The Agra Metro is a rapid transit system in Agra, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). It is set to consist of two metro lines, with a total length of 29.65 kilometres (18.42 mi) and 27 stations. The Agra Metro will be one of four rapid transit system in Uttar Pradesh, the others being the Lucknow Metro, Meerut Metro, Kanpur Metro, and Noida Metro.
As of July 2016[update], DPR has been prepared by RITES and submitted to the state government.[4]
On 28 February 2019, Union Cabinet approved the metro project in Agra worth ₹ 8379.62 crore.[5][6]
6 March 2024: Prime Minister Narendra Modi inaugurated the first stretch of Agra Metro Project.
The cost of construction is estimated at ₹350 crore per km. The cost will be evaluated based on the June 2015 price index.
Agra Metro Rail Project will have 2 corridors that will pass through the heart of the city and will connect prominent tourist places including Taj Mahal, Agra Fort, and Sikandra as well as ISBT, Raja Ki Mandi railway station, Medical College, Agra Cantonment railway station, Collectorate, Sanjay Place, and surrounding densely populated residential areas.
Highlights of these corridors include:
About 20 lakh population of the city is expected to be benefitted by Agra Metro Rail Project directly and indirectly at the time of commencement of commercial operations.
The proposed corridors will be having Multimodal Integration with Railway Stations & BRTS Stations and will have a feeder network of Bus, Intermediate Public Transport (IPT), and Non-Motorized Transport (NMT). The Project will have non-fare box revenue from rental & advertisement as well as Value Capture Financing (VCF) through the mechanism of Transit-Oriented Development (TOD) and Transfer of Development Rights (TDR).
The Agra Metro became operational on 6 March 2024.[7]
In Phase 1, 14 metro stations will be built on the Yellow Line (Line 1) from Sikandra to Taj East Gate and 15 metro stations will be built on the Blue Line (Line 2) from Agra Cantt to Kalindi Vihar.[8]
Line Name | Terminals | Length | Stations | |
---|---|---|---|---|
Yellow Line | Sikandara | Taj East Gate | 14.27 km | 13 |
Blue Line | Agra Cantt | Kalindi Vihar | 15.40 km | 15 |
Total | 29.67 km | 28 |
Phase 1 | |||||||
---|---|---|---|---|---|---|---|
Line Name | Terminals | Length | Stations | Opening Date | |||
Yellow Line | Sikandra | Mankameshwar Mandir | 9.07 km | 7 | Under construction | ||
Mankameshwar | Taj East Gate | 6 km[9] | 6 | 6 March 2024 | |||
Blue Line | Agra Cantt | Kalindi Vihar | 15.40 km | 15 | Planned | ||
Total | 29.67 km | 28 |
Main article: List of Agra Metro stations |
Agra Metro | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Line Name | First Operational | Last Extension | Station | Length | Terminal | Rolling Stock | Track Gauge | Electrification | |||
Yellow Line | 6 March 2024 | N/A | 6 | 5.2 km | Mankameshwar Mandir | Taj East Gate | Alstom MOVIA | 1,435 mm (4 ft 8+1⁄2 in) | 750 V DC third rail |
In 2020, Bombardier Transportation won the contract to supply the rolling stock and the signalling system, and the project received conditional clearance from the Supreme Court.[10][11]However the contract was cancelled and Alstom was chosen to supply the rolling stock for the Yellow line. The rolling stock resembles those that run on the Kanpur Metro. On 6 March 2023, the first set of coaches arrived at the Taj Station of the Yellow line from Alstom's manufacturing facility at Savli in Gujarat.