Country |
Project |
Location |
Start year |
Status |
End year |
Cost |
Notes |
Ref
|
Bangladesh |
Padma Bridge |
Munshiganj, Shariatpur, and Madaripur Districts |
2014 |
Completed |
2022 |
$3.6 billion |
A 6.150 km (3.821 mi) two-level road-rail bridge. It is the longest bridge in Bangladesh, the second-longest in the Indo-Gangetic Plain, and the longest over the Ganges River in terms of both span and the total length. |
[citation needed]
|
Dhaka Metro Rail |
Dhaka |
2016 |
In progress |
|
$2.8 billion |
Of the six planned lines, two are operational as of 2022 and 2023, respectively. |
[citation needed]
|
Karnaphuli Tunnel |
Chittagong |
2017 |
Completed |
2023 |
$1.2 billion |
First underwater tunnel in the South Asian region. |
[citation needed]
|
Bangabandhu Railway Bridge |
Sirajganj to Tangail |
|
In progress |
|
$1.6 billion |
A 4.8 km (3.0 mi) long railway bridge that is expected to be the largest dedicated rail bridge in the country after completion. |
[citation needed]
|
Hazrat Shahjalal International Airport Terminal 3 |
Dhaka |
2019 |
In progress |
2024 (proj.) |
$2.5 billion |
Upon completion of the third terminal, passenger handling capacity of the airport will increase to 20 million from the current 8 million per annum. Cargo handling capacity will also increase to 500,000 from 200,000 tonnes annually. |
[citation needed]
|
Rooppur Nuclear Power Plant |
Ishwardi |
2017 |
In progress |
2025 (proj.) |
$12.65 billion |
It will be the country's first nuclear power plant. |
[citation needed]
|
Central Business District |
Purbachal |
|
In progress |
|
$17 billion |
It will have three super-tall skyscrapers, surrounded by thirty-eight 40+ floor skyscrapers. |
[citation needed]
|
India |
Bharatmala |
Nationwide |
2017 |
In progress |
|
More than $110 billion |
Road development project under the Ministry of Road Transport and Highways. |
[83]
|
Char Dham Highway |
Uttarakhand |
|
In progress |
|
More than $1.5 billion |
A two-lane National Highway. |
[citation needed]
|
Delhi–Mumbai Industrial Corridor Project |
Six Indian states |
|
In progress |
|
More than $90 billion |
Investments will be spread across the 1,500 km (930 mi) long Western Dedicated Freight Corridor, which will serve as the industrial corridor's transportation backbone. |
[84][85][86]
|
Hyderabad Metro Rail |
Hyderabad, Telangana |
2012 |
In progress |
|
More than $2.5 billion |
Two of the three planned lines became operational in 2017. |
[87][88][89]
|
Hyperloop |
Nationwide |
|
Proposed |
|
|
Proposal to establish hyperloop infrastructure for the Pune-Mumbai, Chennai-Bangalore, and Amaravati-Vijayawada corridors. |
[90][91][92]
|
Mumbai–Ahmedabad high-speed rail corridor |
Mumbai-Ahmedabad corridor |
|
In progress |
2027 proj. |
More than $18 billion |
When completed, it will be India's first high-speed rail line. |
[93]
|
Navi Mumbai International Airport |
Mumbai |
2021 |
In progress |
2024 (proj.) |
More than $2.5 billion |
This project aims to ease air traffic congestion at Chhatrapati Shivaji Maharaj International Airport. |
[94]
|
Noida International Airport |
Noida, Uttar Pradesh |
2021 |
In progress |
|
More than $4 billion |
This airport aims to decongest the load of the Indira Gandhi International Airport in Delhi by serving 120 million passengers per year over eight runways. The airport is expected to expand in three phases over 30 years and will be one of the world's largest airports upon completion. Phase 1 will be completed in 2024. |
[95][96]
|
Sagarmala |
Nationwide |
|
In progress |
|
More than $130 billion |
A Ministry of Ports, Shipping and Waterways project meant to enhance the country's logistics sector. |
[97][98]
|
Indonesia |
Jakarta MRT |
Jakarta |
|
In progress |
|
$2.86 billion |
As of 2019, one of the four planned lines is operational. The next two lines to open are expected to open in 2024 and 2026. |
[citation needed]
|
Greater Jakarta LRT |
Jakarta |
2004 |
In progress |
2023 |
$1.58 billion |
Phase 1, the Bekasi Line and part of the Cibubur Line, were completed in 2023. |
[99]
|
Jakarta–Bandung HSR |
Java |
2016 |
In progress |
|
$5.5 billion |
3 of the 4 planned lines have been opened and are operational. |
[citation needed]
|
Trans-Sumatra Toll Road |
Sumatra |
|
In progress |
|
$33.2 billion |
Of the 17 planned segments, 8 have been completed as of 2019. |
[citation needed]
|
Japan |
Japan's Maglev High-Speed Rail (Chūō Shinkansen) |
Tokyo–Nagoya–Osaka |
2014 |
In progress |
2037 proj. |
¥9 trillion |
|
[citation needed]
|
Malaysia |
Klang Valley Mass Rapid Transit Project |
Kuala Lumpur |
2016 |
In progress |
2028 proj. |
RM50 billion |
When completed, it will be operated as part of the Klang Valley Integrated Transit System. |
[citation needed]
|
MRL East Coast Rail Link (ECRL) |
Kelantan, Terengganu, Pahang, Negeri Sembilan, Selangor |
2017 |
In progress |
2027 proj. |
RM44 billion |
|
[citation needed]
|
Kuala Lumpur International Airport |
Selangor |
1993 |
Completed |
|
RM3.92 billion |
|
[citation needed]
|
Penang Sentral |
Penang |
2007 |
Completed |
2018 |
RM230 million |
|
[citation needed]
|
West Coast Expressway |
Selangor and Perak |
2014 |
In progress |
|
RM5.044 billion |
|
[citation needed]
|
Pakistan |
Karachi–Lahore Motorway |
Karachi to Peshawar through Islamabad, Lahore, Multan and Sukkur |
2015 |
Completed |
2020 |
$6.6 billion |
This six-lane, high-speed, limited-access motorway is 1,694 km (1,053 mi) in length. |
[citation needed]
|
Karachi Circular Railway |
Karachi |
2001 |
In progress |
|
$1.6 billion |
Revival of the Karachi Circular Railway, which became operational in 1969 and closed in 1999 due to mismanagement. The project includes 23 stations, 3 lines and more than 50 km (31 mi) of track. |
[citation needed]
|
Karachi Metrobus |
Karachi |
2013 |
In progress |
|
$400 million |
Two of the 6 planned lines are operational. |
[citation needed]
|
Malir Expressway |
Karachi |
2022 |
In progress |
2024 (proj.) |
$400 million |
As of August 2023, half of the 40.3 km (25.0 mi) expressway is operational. |
[citation needed]
|
New Gwadar International Airport |
Gwadar |
|
In progress |
2024 (proj. |
$400 million |
This will replace the existing Gwadar International Airport. |
[citation needed]
|
Karachi–Peshawar Railway Line ML-1 |
Multiple Pakistani provinces |
2024 (proj.) |
In progress |
|
$7 billion |
This renovation is part of the China–Pakistan Economic Corridor. |
[citation needed]
|
Orange Line Metro |
Lahore |
2015 |
Completed |
2020 |
$1.500 billion |
This is the first of the three planned Lahore Metro lines and is Pakistan's first driverless metro. |
[citation needed]
|
China |
China–Pakistan Economic Corridor |
Pakistan and Xinjiang, China |
|
In progress |
|
$62 billion |
The project aims to connect Gwadar Port to Xinjiang via a network of highways, railways and pipelines to transport oil and gas. The economic corridor is expected to run about 3,000 km (1,900 mi) |
[100]
|
Beijing Daxing International Airport |
Beijing |
2014 |
Completed |
2019 |
$17 billion |
|
[citation needed]
|
Hong Kong-Zhuhai-Macao Bridge |
Pearl River Delta |
2009 |
Completed |
2018 |
$10.600 billion |
|
[citation needed]
|
Philippines |
Bataan–Cavite Interlink Bridge |
Bataan-Cavite |
2023 |
In progress |
|
$3.75 billion |
A 32 km (20 mi) bridge over Manila Bay that will connect Central and Southern Luzon. |
[101]
|
Manila Metro Rail Transit System |
Metro Manila |
1996 |
In progress |
2028 proj. |
$15.845 million |
One line operational as of 2020. It is expected to have a total of eight lines with a total length of 142 km (88 mi). |
[102][103][104][105][106][107]
|
Mindanao Railway expansion |
Mindanao |
|
|
|
|
|
[108]
|
New Manila International Airport |
Bulacan |
2022 |
In progress |
2027 proj. |
$14.111 billion |
Aims to decongest and eventually replace Ninoy Aquino International Airport. It will be operated by the San Miguel Corporation. |
[109]
|
North–South Commuter Railway |
Metro Manila, Central Luzon |
2019 |
In progress |
2029 proj. |
$14.95 billion |
The railway will connect Clark International Airport with Metro Manila and Calabarzon. |
[110]
|
PNR South Long Haul |
Luzon |
|
In progress |
2027 proj. |
$3.45 billion |
|
[111]
|
South Luzon Expressway expansion |
Metro Manila, Calabarzon |
2006 |
In progress |
$2.278 billion |
|
Includes Toll Road 4 from Calamba to Lucena, Toll Road 5 from Lucena to Matnog, and the Pasig River Expressway. |
[citation needed]
|
Singapore |
Cross Island MRT Line |
Nationwide |
2023 |
In progress |
|
$40.7 billion SGD |
|
[citation needed]
|
Changi Airport Terminal 5 |
Asia–Pacific |
2022 |
In progress |
Mid-2030s (proj.) |
$10 billion USD |
The terminal will be able to handle a capacity of 70 million passengers a year upon completion. |
[citation needed]
|
Marina Coastal Expressway |
Nationwide |
2008 |
Completed |
2013 |
$4.3 billion SGD |
First undersea expressway in Singapore. |
[112]
|
Tuas Mega Port |
|
|
In progress |
|
$20 billion |
Tuas Port will be able to handle 65 million twenty-foot equivalent units (TEUs) annually, almost double the 36.9 million TEUs that Singapore handled in 2020. |
[citation needed]
|
South Korea |
Incheon International Airport |
Seoul Capital Area |
1992 |
Completed |
2024 (proj.) |
Over 3,903₩ trillion |
Intended to replace Gimpo International Airport |
[113][114]
|
Thailand |
High-speed rail in Thailand |
Central, Western and Southern Thailand |
|
In progress |
2037 (proj.) |
$30 billion |
The project consists of four high-speed rail corridors: one international corridor, which will be a part of the Kunming–Singapore Railway project after completion. |
[citation needed]
|
Vietnam |
Long Thanh International Airport |
Ho Chi Minh City |
2019 |
In progress |
After 2035 (proj. |
$7.8 billion |
This project is partially operational. |
[citation needed]
|