M13 Söğütlüçeşme–Yenidoğan | |
---|---|
Overview | |
Status | Planned |
Owner | Istanbul Metropolitan Municipality |
Locale | Istanbul, Turkey |
Termini |
|
Stations | 16 |
Service | |
Type | Rapid transit |
System | Istanbul Metro |
Services | 1 |
Operator(s) | Metro İstanbul |
Rolling stock | CAF Euros |
Technical | |
Line length | 25 km (16 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 1,500 V DC Overhead line |
Line M13, officially referred to as the M13 Söğütlüçeşme–Yenidoğan line, is a rapid transit line of the Istanbul Metro system, currently planned in the Asian part of Istanbul, Turkey.
Built by the Metropolitan Municipality of Istanbul, the line will be 25 km (16 mi) long with 16 stations, and is expected to go into service in 2020s.
The tender of this project was cancelled on January 3, 2018.[1]
Station | District | Connections | Type | Notes |
---|---|---|---|---|
Yenidoğan | Sancaktepe | Underground | Yenidoğan Middle School・Yenidoğan Anadolu High School | |
Soğukpınar | Çekmeköy | Çekmeköy Registry Office | ||
Cumhuriyet | D.020 | |||
Aydınlar | Sultangazi Avenue・Demokrasi Avenue | |||
Sarıgazi | Sancaktepe | (Sarıgazi) | Sancaktepe Governorship | |
Emek | Sancaktepe Şehit Prof. Dr. İlhan Varank Hospital[2] | |||
Esenkent[3] | Ümraniye | Kadosan Oto Industry Site | ||
Dudullu OSB | Dudullu Organize Sanayi Sitesi | |||
İMES | (İMES) | İMES・Dudullu Organize Sanayi Sitesi・Tavukçuyolu Avenue | ||
Şerifali | Kaşif Kalkavan Park | |||
Tatlısu | Turgut Özal Boulevard | |||
Site | (Site) | SOYAK Yenişehir Siteleri | ||
Esatpaşa | Ataşehir | |||
Mobilyacılar Çarşısı | Emaar Square Mall | |||
Ünalan | Kadıköy | (Ünalan)・ (Uzunçayır) | Akasya AVM | |
Söğütlüçeşme | ・ (Söğütlüçeşme)・ (Söğütlüçeşme) | Kadıköy Municipality • Fenerbahçe Şükrü Saracoğlu Stadium |