.mw-parser-output .hidden-begin{box-sizing:border-box;width:100%;padding:5px;border:none;font-size:95%}.mw-parser-output .hidden-title{font-weight:bold;line-height:1.6;text-align:left}.mw-parser-output .hidden-content{text-align:left}You can help expand this article with text translated from the corresponding article in Italian. (January 2022) Click [show] for important translation instructions. View a machine-translated version of the Italian article. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia. Consider adding a topic to this template: there are already 3,018 articles in the main category, and specifying|topic= will aid in categorization. Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article. You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Italian Wikipedia article at [[:it:Ferrovia Cecina-Volterra]]; see its history for attribution. You should also add the template ((Translated|it|Ferrovia Cecina-Volterra)) to the talk page. For more guidance, see Wikipedia:Translation.
Cecina-Volterra railway line
The line near Saline di Volterra
Overview
Statusin use
OwnerRete Ferroviaria Italiana
LocaleTuscany, Italy
Termini
Stations5
Service
TypeHeavy rail
History
Opened1863 (Cecina-Saline di Volterra)
1912 (Saline di Volterra-Volterra)
Closed1958 (Saline di Volterra-Volterra)
Technical
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrificationno
Route map

281.592
Cecina
290.123
Riparbella
297.935
Casino di Terra
Monterufoli mining line (1972–1928)
304.584
Ponte Ginori
311.076
Volterra Saline Pomarance
start of rack (1912–1958)
end of rack
319.121
Volterra

The Cecina-Volterra railway line is an Italian railway line that connects the coast town of Cecina to Saline di Volterra in Tuscany. Until 1958 it continued up into the medieval hilltop town of Volterra.

History

The construction began in 1860, with the line opening between Cecina and Saline di Volterra. There was a plan announced in 1863 to extend the line to the Central Tuscan railway at Poggibonsi, but this was never realised. The line had a small connection to a mine at Monterufoli, which provided a substantial freight traffic until it was dismantled in 1928. In 1912, a rack railway using the Strub system was opened, connecting Saline di Volterra with Volterra town.[1] This line was closed in 1958.

Traffic

The line is kept open to provide connections to school for residents of the valley. The line was served by regionale services until early 2020, when they were suspended due to the COVID-19 pandemic. These were expected to recommence for the 2020-21 school period but this never happened and replacement bus services have been continued indefinitely.[2]

Gallery

References

  1. ^ "Ferrovia Saline di Volterra Pomarance-Volterra - Ferrovie abbandonate". www.ferrovieabbandonate.it. Retrieved 2022-02-01.
  2. ^ "Orario dei treni in partenza dalla stazione di Volterra-Saline-Pomarance - RFI". prm.rfi.it. Retrieved 2022-02-01.