General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | North Hongda Road (宏达北路) and Rongjing East Street (荣京东街) Daxing District, Beijing China | ||||||||||
Coordinates | 39°47′37″N 116°30′48″E / 39.79361°N 116.51333°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Yizhuang line | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2010 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Rongjing Dongjie Station[1] (simplified Chinese: 荣京东街站; traditional Chinese: 榮京東街站; pinyin: Róngjīngdōngjiē Zhàn) is a Subway station on the Yizhuang Line of the Beijing Subway.[2] It opened on December 30, 2010, together with the other stations on the line.
The station has 2 elevated side platforms.
There are 2 exits, lettered A1 and B1. Exit A1 is accessible.