18:5118:51, 26 September 2015diffhist0
Bay Area Rapid Transit
See [Wikipedia:Verifiability, not truth]. The "T/O" claim is un-sourced, and conflicts with the BART Sustainable Communities Operations Analysis (the reference in the article)
18:4718:47, 10 September 2015diffhist+2,401
Economic growth
Consolidate discussion of constraints; clear-cutting the section on physical constraints is (still) not warranted; see talk page #Physical_constraints_to_growth-_reason_to_keep
20:4220:42, 23 August 2015diffhist+43
3D XPoint
Remove brand names and un-sourced comparison to 3D NAND layers; summarize undisclosed technical details, density similar to NAND; SSD latency 10x lower than flash. The previous changes were not minor.
20:0420:04, 21 August 2015diffhist+629
Warm Springs/South Fremont station
The report says "It is now expected to open early next year," and the other report says late 2015 "remains the target." After parsing "expected" versus "targeted," these reports aren't conflicting.)