![]() | |||
Industry | Electrical power | ||
---|---|---|---|
Founded | 1972 | ||
Headquarters | |||
Key people | Fu Jianguo (Chairman of Board of Directors) João Marques da Cruz (Vice-Chairman of Board of Directors) Bernie Leong (Chairman of Executive Committee) | ||
Products | Electricity | ||
Services | Electricity distribution and transmission | ||
Chinese name | |||
Traditional Chinese | 澳門電力股份有限公司 | ||
Simplified Chinese | 澳门电力股份有限公司 | ||
| |||
Alternative Chinese name | |||
Traditional Chinese | 澳門電力 | ||
Simplified Chinese | 澳门电力 | ||
| |||
Second alternative Chinese name | |||
Traditional Chinese | 澳電 | ||
Simplified Chinese | 澳电 | ||
| |||
Website | www |
Companhia de Electricidade de Macau – CEM, S.A. known simply as CEM or Chinese: 澳電 is a private public utility company with a sole concession to transmit, distribute, sell high, medium and low voltage of electricity in Macau. Besides, CEM owns an installed generation capacity of 408 MW.
From 1906 to 1972, the electricity supply service was managed by the "Macao Electric Lighting Company Ltd." (now Melco International Development), which had its headquarters in British Hong Kong. In 1972, due to non-fulfilment of its concession contract with the former Portuguese administration, the company was replaced by CEM.
CEM was restructured with the former Portuguese administration's support in 1982. In 1985, CEM signed the 25-year concession contract. It has since scored achievements in the areas of cost-effectiveness and technology.
In November 2010, the Government of Macau and CEM signed the Power Supply Contract Extension for 15 years. The new contract terms came into effect on 1 December 2010.
In 2014, Nam Kwong (Group) Company Limited purchased a 90% stake in Sino–French Energy Development Co. from Sino-French Holdings (Hong Kong) Ltd and became CEM's biggest shareholder.
In 2016, the Macau Power Station with a history of over 110 years was officially decommissioned.
The CEM logo is a symbol of the company's close ties with customers, Macau and its employees, represented by three dynamic and vibrant curved lines that are well-designed to accentuate a harmonious, interdependent and collaborative relationship. The logo is simple and vivid, with yellow representing energy and vitality, and orange representing prosperity.
The Macau electricity transmission network comprises 25 primary substations, 8 customer high-voltage switching stations and 953 kilometres of 66 kV, 110 kV and 220 kV high-voltage cables. The Macau electricity network is connected to China Southern Power Grid via two 110 kV cables and two 220 kV cables. The two 110 kV cables are connected to Gongbei Substation and Nanping Substation, while the two 220 kV cables are connected to Zhuhai Substations and Qinyun Substation.
The 11kV medium-voltage electricity transmission network comprises 41 customer switching stations and 1,502 customer substations (11 kV/400 V) connected by cables with a total length of 2,294 kilometres. The low-voltage transmission network is made up of 906 kilometres of cable, while the street lighting network comprises 571 kilometres of cable and about 11,105 streetlights. The power network of CEM consists almost entirely of underground cables.
According to CEM's annual report, in 2018, the Average Service Availability Index (ASAI) was 99.9998%, while the Customer Average Interruption Duration Index was 6.56 minutes, achieving the goal of less than 20 minutes.
CEM adopted international management standards to ensure the compliance of sustainable development in the company. So far, CEM has been certified with the following international standards:
The actual capacity of CEM's generation consists of two power stations located on the Coloane Island, namely Coloane Power Station A (CCA) and Coloane Power Station B (CCB). The types of generation technology deployed are the low speed diesel generator (CCA) and the combined cycle gas turbine (CCB).