The topic of this article may not meet Wikipedia's general notability guideline. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted.Find sources: "AEC metro station" – news · newspapers · books · scholar · JSTOR (January 2024) (Learn how and when to remove this template message)

AEC
Ahmedabad Metro station
Platform view of AEC metro station
General information
LocationDharm Nagar II, Sabarmati, Ahmedabad, Gujarat 380005
Coordinates23°04′30″N 72°35′36″E / 23.07511°N 72.59321°E / 23.07511; 72.59321
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Motera Stadium
Platform-2 → APMC
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opening6 October 2022; 16 months ago (6 October 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Sabarmati Red Line Sabarmati Railway Station
towards APMC
Location
Map

AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1][failed verification] Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.

This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2][3][4][5]

Station layout

AEC track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → APMC next station is Sabarmati Railway Station
Platform 1
Northbound
Towards ← Motera Stadium next station is Sabarmati
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

This section is empty. You can help by adding to it. (August 2023)

See also

References

  1. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  2. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  3. ^ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
  4. ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  5. ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.