The topic of this article may not meet Wikipedia's general notability guideline. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted.Find sources: "Commerce Six Road metro station" – news · newspapers · books · scholar · JSTOR (January 2024) (Learn how and when to remove this template message)

Commerce Six Road
Ahmedabad Metro station
General information
LocationSarvottam Nagar Society, Navrangpura, Ahmedabad, Gujarat 380009
Coordinates23°02′27″N 72°33′11″E / 23.04070°N 72.55302°E / 23.04070; 72.55302
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Blue Line
PlatformsSide platform
Platform-1 → Vastral Gam
Platform-2 → Thaltej
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opening30 September 2022; 15 months ago (30 September 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Gujarat University
towards Thaltej
Blue Line SP Stadium
towards Vastral Gam
Location
Map

Commerce Six Road is an elevated metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. This metro station consists of the main Navarangpura Fire Station along with Passport Seva Kendra and M.G. Science Institute in Ahmedabad. This metro station was opened to the public on 30 September 2022.[1][2][3][4]

Station layout

Commerce Six Road track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Vastram Gam next station is SP Stadium
Platform 2
Westbound
Towards ← Thaltej next station is Gujarat University
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

This section is empty. You can help by adding to it. (August 2023)

See also

References

  1. ^ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
  2. ^ www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
  3. ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  4. ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.