Kalupur Railway Station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Ahmedabad Metro station | |||||||||||
General information | |||||||||||
Location | Saraspur, Ahmedabad, Gujarat 380002 | ||||||||||
Coordinates | 23°01′30″N 72°36′11″E / 23.02512°N 72.60305°E | ||||||||||
Owned by | Gujarat Metro Rail Corporation Limited | ||||||||||
Operated by | Ahmedabad Metro | ||||||||||
Line(s) | Blue Line | ||||||||||
Platforms | Island platform Platform-1 → Vastral Gam Platform-2 → Thaltej | ||||||||||
Tracks | 2 | ||||||||||
Connections | Ahmedabad Junction | ||||||||||
Construction | |||||||||||
Structure type | Underground, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Operational | ||||||||||
History | |||||||||||
Opening | 30 September 2022 | ||||||||||
Electrified | 750 V DC third rail | ||||||||||
Services | |||||||||||
| |||||||||||
|
Kalupur Railway Station is an underground metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. This metro station consists of the main Ahmedabad Junction railway station which leads towards Gandhinagar Capital in the north and towards Nadiad Junction railway station in the south. This metro station was opened to the public on 30 September 2022.[1][2][3][4]
Kalupur Railway Station track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
|
G | Street level | Exit/ Entrance |
M | Mezzanine | Fare control, station agent, Ticket/token, shops |
P | Platform 1 Eastbound |
Towards → Vastral Gam next station is Kankaria East |
Island platform | Doors will open on the right | ||
Platform 2 Westbound |
Towards ← Thaltej next station is Gheekanta |