Las Vegas Convention Center Loop | |
---|---|
Overview | |
Other name(s) | LVCC Loop |
Status | Closed when there are no events at Convention Center |
Owner | |
Termini |
|
Stations | 5 |
Website | |
Service | |
Type | Dedicated taxi route |
System | Underground car shuttle private roadway |
History | |
Opened | June 1, 2021 |
Technical | |
Line length | 1.7 miles (2.7 km) |
Character | Twin Tunnel |
Electrification | Tesla Supercharger[nb 1] |
Operating speed | 35 mph (56 km/h) |
LVCC Loop | |||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Las Vegas Convention Center Loop (LVCC Loop) is a transportation system at the Las Vegas Convention Center. Operating since 2021, the system uses Tesla Model 3 cars to shuttle passengers between five stations. Construction was carried out by The Boring Company from 2019 to 2021.[1]
The transportation system consists of twin tunnels in which Tesla cars are driven by employees to shuttle passengers to stops at the Las Vegas Convention Center complex and Las Vegas transportation connections.[2] The loop cost $53 million when it opened in June 2021 and is 40 feet (12 m) below ground. The two below-ground stations have escalators and elevators. The loop is 1.7 miles (2.7 km) in length and covers a 25-minute walking distance. The plan is for the cars to be autonomous vehicles in the future.[3]
The Boring Company won the contract in May 2019. The Boring Company's contract was for $48.7 million. [4] The Boring Company first tunnel was started on November 15, 2019, digging at about 49 feet (15 m) per day; the 4,475 feet (1,364 m) first leg tunnel was completed on February 14, 2020.[5][6] The Boring Company's second tunnel was finished in May 2020.[3]
The Boring Company started testing the system with volunteers in May 2021. The test demonstrated the new transport system could move up to about 4,400 passengers per hour with an end-to-time of about two minutes. In July 2021 the peak passenger flow was recorded at 1,355 passengers per hour. [7][8] [9]
There are other phases planned, in the completed phase there will be about 68 miles (109 km) of tunnels and 55 stops, including stops at Harry Reid International Airport, Allegiant Stadium, Brightline West Las Vegas Station, and downtown Las Vegas.[11][12][13][14] The next stops will be tunnels to Encore and Westgate resorts.[10][15] The Boring Company tunnel boring machine, Prufrock-2 is working its way to Encore on Las Vegas Boulevard. Tunnel boring machine Prufrock-1 has tunneled to Westgate on Paradise Road. [16][17]
The Loop connects to the Las Vegas Monorail at the Boingo Station, LV Monorail station at the corner of Paradise Road and East Desert Inn Road at an Island above East Desert Inn Road. Buses that are near the Loop and Las Vegas Convention Center are the: RTC 108,[18] RTC 119[19] and Las Vegas Deuce.[20][21]