British grid electricity in 2022[1]
The United Kingdom is the best location for wind power in Europe and one of the best in the world.[2][3] By 2023, the UK had over 11 thousand wind turbines with a total installed capacity of 28 gigawatts (GW): 14 GW onshore and 14 GW offshore,[4] the sixth largest capacity of any country.[5] Wind power generated about 25% of UK electricity, having surpassed coal in 2016[6][7] and nuclear in 2018.[8] It is the largest source of renewable electricity in the UK.[9]
From 2023 all windpower reduces the price of electricity: but in earlier years onshore wind built before the mid-2010s and offshore wind built before the late 2010s sometimes increased the price of electricity.[10] Polling of public opinion consistently shows strong support for wind power in the UK, with nearly three-quarters of the population agreeing with its use, even for people living near onshore wind turbines.[11][12][13][14][15][16]
The government has committed to a major expansion of offshore capacity to 50 GW by 2030,[17][18] with 5GW from floating wind.[19] One reason for this is to improve energy security.[20]
UK wind farm capacity by region (table of figures) | |||||
---|---|---|---|---|---|
UK Region | Onshore wind capacity | Offshore wind capacity | |||
2015 (MW) | 2020 (MW) | 2015 (MW) | 2020 (MW) | 2025 (MW) Projected | |
Scotland | 5,413 | 7,543 | 174 | 889 | 2,743 |
N.W. England | 111 | 193 | 1,087 | 2,005 | 2,005 |
N.E.England | 116 | 170 | 62 | 102 | 102 |
Yorks & Humber | 771 | 806 | 429 | 1,659 | 8,045 |
N. Ireland | 365 | 472 | 0 | 0 | 0 |
Wales | 448 | 936 | 726 | 726 | 726 |
East Midlands | 56 | 56 | 464 | 464 | 1,321 |
Eastern | 131 | 157 | 1,053 | 2,381 | 2,381 |
S.E. England | 60 | 60 | 1,070 | 1,470 | 1,470 |
S.W. England | 20 | 20 | 0 | 0 | 0 |
UK Totals | 7,491 | 10,414 | 5,064 | 9,695 | 18,792 |
The world's first electricity generating wind turbine was a battery charging machine installed in July 1887 by Scottish academic James Blyth to light his holiday home in Marykirk, Scotland.[24] It was in 1951 that the first utility grid-connected wind turbine to operate in the United Kingdom was built by John Brown & Company in the Orkney Islands.[24][25] In the 1970s, industrial scale wind generation was first proposed as an electricity source for the United Kingdom; the higher working potential of offshore wind was recognised with a capital cost per kilowatt estimated at £150 to £250.[26]
In 2007 the United Kingdom Government agreed to an overall European Union target of generating 20% of the EU's energy supply from renewable sources by 2020. Each EU member state was given its own allocated target: for the United Kingdom it is 15%. This was formalised in January 2009 with the passage of the EU Renewables Directive. As renewable heat and renewable fuel production in the United Kingdom are at extremely low bases, RenewableUK estimated that this would require 35–40% of the United Kingdom's electricity to be generated from renewable sources by that date,[27] to be met largely by 33–35 gigawatts (GW) of installed wind capacity.
In December 2007, the Government announced plans for an expansion of wind energy in the United Kingdom, by conducting a Strategic Environmental Assessment of up to 25 GW worth of wind farm offshore sites in preparation for a new round of development. These proposed sites were in addition to the 8 GW worth of sites already awarded in the two earlier rounds of site allocations, Round 1 in 2001 and Round 2 in 2003. Taken together it was estimated that this would result in the construction of over 7,000 offshore wind turbines.[28]
In 2010, 653 MW of offshore wind came online. The following year, only one offshore wind farm, phase 1 of the Walney Wind Farm, was completed in 2011 with a capacity of 183 MW. On 28 December 2011 wind power set a then record contribution to the United Kingdom's demand for electricity of 12.2%.[29]
2012 was a significant year for the offshore wind industry with 4 large wind farms becoming operational with over 1.1 GW of generating capability coming on stream.[30] In the year July 2012 to June 2013, offshore wind farms with a capacity of 1.463 GW were installed, for the first time growing faster than onshore wind which grew by 1.258 GW.[31] The offshore wind industry continued to develop in 2013 with what was once the largest wind farm in the world, the London Array, becoming operational with over 630 MW of generating capability coming on stream.[32]
During 2013, 27.4 TWh of energy was generated by wind power, which contributed 8.7% of the UK's electricity demand.[33]
On 1 August 2013, Deputy Prime Minister Nick Clegg opened the Lincs Offshore Wind Farm. On commissioning the total capacity of wind power exceeded 10 GW of installed capacity.[citation needed] In 2014, Prime Minister David Cameron said that people were "fed up" with wind turbines being built close to homes; onshore wind subsidies were removed and in 2015 planning rules changed to give local authorities strong controls on wind turbine development, greatly reducing onshore deployment.[34]
During 2014, 28.1 TWh of energy was generated by wind power (an average of 3.2 GW, about 24% of the 13.5 GW installed capacity at the time), which contributed 9.3% of the UK's electricity requirement.[35] In the same year, Siemens announced plans to build a £310 million ($264 million)[dubious ] facility for making offshore wind turbines in Paull, England, as Britain's wind power capacity rapidly expanded. Siemens chose the Hull area on the east coast of England because it is close to other large offshore projects planned in coming years. The new plant began producing turbine rotor blades in December 2016.[36] The plant and the associated service centre, in Green Port Hull nearby, will employ about 1,000 workers.[37]
During 2015, 40.4 TW·h of energy was generated by wind power and the quarterly generation record was set in the three-month period from October to December 2015, with 13% of the nation's electricity demand met by wind.[38] 2015 saw 1.2 GW of new wind power capacity brought online, a 9.6% increase of the total UK installed capacity. Three large offshore wind farms came on stream in 2015, Gwynt y Môr (576 MW max. capacity), Humber Gateway (219 MW) and Westermost Rough (210 MW).
In 2016, the chief executive of DONG Energy (now known as Ørsted A/S), the UK's largest wind farm operator, predicted that wind power could supply more than half of the UK's electricity demand in the future. He pointed to the tumbling cost of green energy as evidence that wind and solar could supplant fossil fuels quicker than expected.[39]
By 2020, climate change concerns led to greater public support for wind turbines, but despite government policy stating onshore wind is a "key building block" for electricity generation it was unclear if the 2015 onshore planning restrictions would be eased.[34] In 2022 three-quarters of the UK population supported further wind generated power in the UK and the majority would be happy for a wind farm to be built near them.[40]
In 2022, wind generation in the UK exceeded 20 GW for the first time, reaching 20.9 GW between 1200h and 1230h on 2 November 2022.[41] This was followed in 2023 with a record 21.6 GW on 10 January during a period of strong winds.[42]
Year[43] | Cumulative capacity (MW) |
Generation (GWh) |
Capacity factor % (Onshore %, Offshore %) |
% of total electricity use |
Refs |
---|---|---|---|---|---|
2008 | 2,974 | 5,357 | 20.6 | 1.50 | [44] |
2009 | 4,051 | 6,904 | 19.5 | 2.01 | [44] |
2010 | 5,204 | 7,950 | 17.4 | 2.28 | [44] |
2011 | 6,540 | 12,675 | 22.1 | 3.81 | |
2012 | 8,871 | 20,710 | 26.7 | 5.52 | |
2013 | 10,976 | 24,500 | 25.5 | 7.39 | [45] |
2014 | 12,440 | 28,100 | 25.8 | 9.30 | [46] |
2015 | 13,602 | 40,442 | 33.9 | 11.0 | [47] |
2016 | 16,218 | 37,368 | 26.3 | 12 | [48] |
2017 | 19,837 | 49,607 | 28.5 | 17 | [48][49] |
2018 | 21,700 | 57,100 | 30.0 | 18 | [50][51] |
2019 | 23,950 |
64,134 |
32% | 21 | [52][53] |
2020 | 24,485 | 75,369 | ~35.5 (28, 46) |
24 | [54] |
2021 | 25,730 | 64,460 | ~29.3 (23, 37) |
21 | [54] |
2022 | 28,537[55] (Q3) | 54,150[55] (Q3) | 26.8 | [56] |
The total offshore wind power capacity installed in the United Kingdom at the start of 2022 was 11.3 GW. The United Kingdom became the world leader of offshore wind power generation in October 2008 when it overtook Denmark.[57] In 2013, the 175-turbine London Array wind farm, located off the Kent coast, became the largest offshore wind farm in the world; this was surpassed in 2018 by the Walney 3 Extension.
The United Kingdom has been estimated to have over a third of Europe's total offshore wind resource, which is equivalent to three times the electricity needs of the nation at current rates of electricity consumption[58] (In 2010 peak winter demand was 59.3 GW,[59] in summer it drops to about 45 GW). One estimate calculates that wind turbines in one third of United Kingdom waters shallower than 25 metres (82 ft) would, on average, generate 40 GW; turbines in one third of the waters between 25 metres (82 ft) and 50 metres (164 ft) depth would on average generate a further 80 GW, i.e. 120 GW in total.[60] An estimate of the theoretical maximum potential of the United Kingdom's offshore wind resource in all waters to 700 metres (2,300 ft) depth gives the average power as 2200 GW.[61]
The first developments in United Kingdom offshore wind power came about through the now discontinued Non-Fossil Fuel Obligation (NFFO), leading to two wind farms, Blyth Offshore and Gunfleet sands.[62] The NFFO was introduced as part of the Electricity Act 1989 and obliged United Kingdom electricity supply companies to secure specified amounts of electricity from non-fossil sources,[63] which provided the initial spur for the commercial development of renewable energy in the United Kingdom.
Offshore wind projects completed in 2010–2011 had a levelised cost of electricity of £136/MWh, which fell to £131/MWh for projects completed in 2012–14 and £121/MWh for projects approved in 2012–2014; the industry hopes to get the cost down to £100/MWh for projects approved in 2020.[64]
The construction price for offshore windfarms has fallen by almost a third since 2012 while technology improved and developers think a new generation of even larger turbines will enable yet more future cost reductions.[65] In 2017 the UK built 53% of the 3.15 GW European offshore wind farm capacity.[66] In 2020, Boris Johnson pledged that, by the end of the decade, offshore wind would generate enough energy to power every UK home.[67]
At the start of 2022 there was a total of 11.26 GW of installed offshore wind capacity.[54] During 2022 an additional 3.2 GW of capacity was added with the commissioning of the Moray East, Triton Knoll and Hornsea Project Two wind farms.[68][69][70] A further 13.6 GW of capacity is either under construction (Neart Na Gaoithe, Sofia, Seagreen & Doggerbank A) or has been awarded a Contract for Difference in Round 3[71] or Round 4.[72]
In 1998, the British Wind Energy Association (now RenewableUK) began discussions with the government to draw up formal procedures for negotiating with the Crown Estate, the owner of almost all the United Kingdom coastline out to a distance of 12 nautical miles (22.2 km), to build offshore wind farms. The result was a set of guidelines published in 1999, to build "development" farms designed to give developers a chance to gain technical and environmental experience. The projects were limited to 10 km2 (3.9 square miles) in size and with a maximum of 30 turbines. Locations were chosen by potential developers and a large number of applications were submitted. Seventeen of the applications were granted permission to proceed in April 2001, in what has become known as Round 1 of United Kingdom offshore wind development.[73]
The first of the Round 1 projects was North Hoyle Wind Farm, completed in December 2003. The final project, Teesside, was completed in August 2013. Twelve Round 1 farms in total are in operation providing a maximum power generating capacity of 1.2 GW. Five sites were withdrawn, including the Shell Flat site off the coast of Lancashire.[74]
Lessons learnt from Round 1, particularly the difficulty in getting planning consent for offshore wind farms, together with the increasing pressure to reduce CO2 emissions, prompted the then Department of Trade and Industry (DTI) to develop a strategic framework for the offshore wind industry. This identified three restricted areas for larger scale development, Liverpool Bay, the Thames Estuary and the area beyond the Wash, called the Greater Wash, in the North Sea. Development was prevented in an exclusion zone between 8 and 13 km offshore to reduce visual impact and avoid shallow feeding grounds for sea birds. The new areas were tendered to prospective developers in a competitive bid process known as Round 2. The results were announced in December 2003 with 15 projects awarded with a combined power generating capacity of 7.2 GW. By far the largest of these is the 900 MW Triton Knoll.[76] As before a full Environmental Impact Assessment (EIA) would be needed along with an application for planning consent.
The first of the Round 2 projects was Gunfleet Sands II, completed in April 2010 and six others are now operational including the London Array, formerly the largest wind farm in the world. Four other Round 2 sites are currently under construction.[74]
In May 2010, the Crown Estate gave approval for seven Round 1 and 2 sites to be extended creating an additional 2 GW of offshore wind capacity.[77] Each wind farm extension will require a complete new planning application including an Environmental Impact Assessment and full consultation. The sites are:[78]
Following on from the Offshore wind SEA announced by the Government in December 2007, the Crown Estate launched a third round of site allocations in June 2008. It followed the success of Rounds 1 and 2, from which important lessons were learnt; Round 3 was on a much bigger scale than the combined total of its predecessors (Rounds 1 and 2 allocated 8 GW of sites, while Round 3 alone could identify up to 25 GW).
The Crown Estate proposed nine offshore zones, within which a number of individual wind farms would be situated. It ran a competitive tender process to award leases to consortia of potential developers. The bidding closed in March 2009 with over 40 applications from companies and consortia and multiple tenders for each zone. The successful bidders were announced on 8 January 2010.
Following the allocation of zones, individual planning applications still had to be sought by developers. The first zone came on stream in 2018; several more have still to be completed, and some have been abandoned (see below).
During the bidding process there was considerable speculation over which companies had bid for the zones. The Crown Estate did not make the list public and most of the consortia also remained silent. The successful bidders for each zone were eventually announced as follows:[79]
Zone[80] | Zone name | Wind farm site names | Potential power (GW) |
Developer | Notes |
---|---|---|---|---|---|
1 | Moray Firth | Beatrice | 1.3 (0.58) | Moray Offshore Renewables Ltd | Formed from EDP Renováveis and SeaEnergy Renewables Ltd (SERL) Project scaled down to 588 MW Commenced commercial operation in 2018 |
2 | Firth of Forth | Alpha/Bravo | 3.5 | Seagreen Wind Energy Ltd | Partnership between SSE Renewables and Fluor Ltd. SSE withdrawing support beyond the consent process. |
3 | Dogger Bank | Crekye A/B & Teesside A/B/C/D | 7.2 | Forewind Ltd | A consortium made up of SSE Renewables, RWE npower, Statkraft and Statoil. SSE withdrawing support beyond the consent process. Project scaled down to 4.8 GW in 2015 Expected to commence commercial operation in 2024 |
4 | Hornsea | Hornsea One, Two, Three and Four (formerly Heron/Njord/Breesea/Optimus & SPC5/6/7/8) | 6 | Ørsted (formerly SMart Wind Ltd) | SMart Wind was a joint venture between Mainstream Renewable Power and Siemens Project Ventures. 100% acquired in 2015 by DONG Energy, which rebranded as Ørsted in 2017.
Hornsea One (1.2 GW) became fully operational in December 2019.[81] Hornsea Two (1.32 GW) became fully operational on 31 August 2022. Development consent for Hornsea Three (2.4 GW) was granted on 31 December 2020 and Ørsted signed the CfD for the project on 3 August 2022.[82] Hornsea Four remains in development. |
5 | East Anglia | East Anglia ONE/TWO/THREE/ONE NORTH | 7.2 | East Anglia Offshore Wind Limited | Joint venture between ScottishPower Renewables and Vattenfall AB ONE commenced commercial operations in 2020. TWO is expected to be fully operational by 2022. THREE is expected to start construction in 2022 |
6 | Southern Array | Rampion | 0.6 (0.4) | E.ON Climate & Renewables / UK Southern Array Ltd | Located south of Shoreham-by-Sea and Worthing in the English Channel Commenced commercial operation in 2018 |
7 | West of Isle of Wight | Navitus Bay | 0.9 | Eneco Round 3 Development Ltd | West of the Isle of Wight; partnership between Eneco and EDF. Planning permission refused by government in September 2015 due to visual impact.[83] |
8 | Atlantic Array | Atlantic Array | Channel Energy Ltd (Innogy) | Withdrawn in November 2013 as "project uneconomic at current time"[84] | |
9 | Irish Sea | Celtic Array | Celtic Array Limited | Withdrawn in July 2014 due to "challenging ground conditions that make the project economically unviable".[85] | |
Total | 26.7 |
In 2009, during the Round 3 initial proposal stage 26.7 GW of potential capacity was planned. However, due to government planning permission refusal, challenging ground conditions and project financing issues, a number of proposed sites were withdrawn. A number of other sites were also reduced in scope.
Round 4 was announced in 2019 and represented the first large scale new leasing round in a decade. This offers the opportunity for up to 7 GW of new offshore capacity to be developed in the waters around England and Wales.[86] This is split into four bidding areas:
The tenders are under review and the Agreements for Lease will be announced in Autumn 2021. In February 2021, four winners for almost 8 GW were found, mostly new entries. Option fees were introduced this time, with clearing prices ranging from £76,203 (US$105,022) per megawatt year to £154,000 (US$212,241) for sites ranging from 480 MW to 1.5 GW. The Crown Estate will be collecting annual revenues of around £880 million until the sites reach FID or for a maximum of 10 years.[87][88]
The UK has accelerated its decommissioning of coal power stations aiming for a 2024 phase-out date,[89] and recent British nuclear power stations have encountered significant technical issues and project overruns that have resulted in significant increases in project costs.[90] These issues have resulted in new UK nuclear projects failing to secure project financing. Similarly, SMR technology is not currently economically competitive with offshore wind in the UK. Following the Fukushima nuclear disaster public support for new nuclear has fallen.[91] In response, the UK government increased its previous commitment for 40 GW of Offshore wind capacity by 2030.[92] As of 2020, this represents a 355% increase over current capacity in 10 years. It is expected the Crown Estate will announce multiple new leasing Rounds and increases to existing bidding areas throughout the 2020–2030 period to achieve the government's aim of 40 GW.
In addition to the 25 GW scoped under the Round 3 SEA, the Scottish Government and the Crown Estate also called for bids on potential sites within Scottish territorial waters. These were originally considered as too deep to provide viable sites, but 17 companies submitted tenders and the Crown Estate initially signed exclusivity agreements with 9 companies for 6 GW worth of sites. Following publication of the Scottish Government's sectoral marine plan for offshore wind energy in Scottish territorial waters in March 2010,[93] six sites were given approval subject to securing detailed consent. Subsequently, 4 sites have been granted agreements for lease.[94]
The complete list of sites including power updates and developer name changes:
Site Name | Potential power (MW) |
Developer | Notes | |
---|---|---|---|---|
Beatrice | 588 | SSE Renewables plc and Talisman Energy | SSE owns 40%, Copenhagen Infrastructure Partners (CIP) (35%) and SDIC Power (25%). Application approved by Marine Scotland in March 2014, Construction to begin early 2017.[95] Fully operational in June 2019[96] | |
Inch Cape | 1000 | Repsol Nuevas Energias SA EDP Renewables |
Repsol owns 51%, EDPR owns 49%. Application approved by Marine Scotland in October 2014 | |
Neart Na Gaoithe | 450 | Mainstream Renewable Power Ltd | Application approved by Marine Scotland in October 2014 | |
Islay | SSE Renewables | No further investment from SSE into the project for the foreseeable future.[97] | ||
Solway Firth | E.ON Climate & Renewables UK Developments | Dormant – Unsuitable for development | ||
Wigtown Bay | DONG Wind (UK) | Dormant – Unsuitable for development | ||
Kintyre | Airtricity Holdings (UK) Ltd | Cancelled due to proximity to local communities and Campbeltown Airport[98] | ||
Forth Array | Fred. Olsen Renewables Ltd | Cancelled. Fred. Olsen pulled out to concentrate on its onshore developments[99] | ||
Bell Rock | Airtricity Holdings (UK) Ltd Fluor Ltd |
Cancelled due to radar services in the area.[100] | ||
Argyll Array | Scottish Power Renewables | Cancelled due to ground conditions and presence of basking sharks[101] | ||
Total | 2,200 |
In 2022 Crown Estate announced the outcome of its application process for ScotWind Leasing, the first Scottish offshore wind leasing round in over a decade and the first ever since the management of offshore wind rights were devolved to Scotland. 17 projects were selected with a capacity of 25 GW.
Farm | Commissioned | Estimated completion |
Power (MW) | No. Turbines | Operator | Notes | Round |
---|---|---|---|---|---|---|---|
North Hoyle | December 2003 | 60 | 30 | Greencoat (formerly Npower Renewables) | United Kingdom's first major offshore wind farm. | 1 | |
Scroby Sands | December 2004 | 60 | 30 | E.ON UK | 1 | ||
Kentish Flats | December 2005 | 140 | 45 | Vattenfall | Extension added in 2015.[4] | 1 | |
Barrow Offshore Wind | May 2006 | 90 | 30 | Ørsted | 1 | ||
Burbo Bank | October 2007 | 348 | 57 | Ørsted | 258 MW, 32 turbine extension completed in April 2017.[103] | 1–2 | |
Lynn and Inner Dowsing | October 2008 | 194 | 54 | Green Investment Bank | 1 | ||
Rhyl Flats | December 2009 | 90 | 25 | RWE | Officially inaugurated 2 December 2009[104] | 1 | |
Gunfleet Sands | April 2010 | 173 | 48 | Ørsted | Officially inaugurated 15 June 2010[105] | 1–2 | |
Robin Rigg | April 2010 | 174 | 60 | E.ON UK | 1 | ||
Thanet | September 2010 | 300 | 100 | Vattenfall | 2 | ||
Walney | February 2012[106] | 1,026 | 189 | Ørsted | Extended in September 2018 with a 659 MW, 87 turbine extension.[107] | 2 | |
Ormonde | February 2012 | 150 | 30 | Vattenfall | Commissioned 22 February 2012.[108] | 1 | |
Greater Gabbard | August 2012 | 857 | 196 | SSE, RWE | Commissioned 7 August 2012.[109] 56 turbine, 353 MW extension "Galloper" completed in April 2018.[110] | 2 | |
Sheringham Shoal | September 2012 | 317 | 88 | Vattenfall | Commissioned 27 September 2012[111] | 2 | |
London Array | April 2013[112] | 630 | 175 | RWE, Ørsted, CDPQ, Masdar | Commissioned 6 April 2013.[113] Was world's largest offshore wind farm until 2018.[114] Phase 2 (370MW) scrapped.[115] RWE (30%), Ørsted (25%), Caisse de dépôt et placement du Québec (CDPQ) (25%), Masdar (20%)[116] | 2 | |
Lincs | July 2013 | 270 | 75 | Green Investment Bank | Commissioned 5 July 2013[117] | 2 | |
Teesside | August 2013 | 62 | 27 | EDF Renewables | Final Round 1 project completed | 1 | |
Fife Energy Park (Methil) | October 2013 | 7 | 1 | Catapult | 7 MW turbine evaluation project. Installation complete March 2014[118] | Demo | |
West of Duddon Sands | October 2014 | 389 | 108 | Scottish Power Renewables and Ørsted | Officially opened 30 October 2014.[119] | 2 | |
Westermost Rough | May 2015[120] | 210 | 35 | Ørsted | Offshore construction started beginning of 2014.[121] First use of 6 MW turbine.[122] | 2 | |
Humber Gateway | June 2015[123] | 219 | 73 | RWE, Greencoat Capital | First monopole installed September 2013[124] RWE (51%), Greencoat Capital (49%)[125] | 2 | |
Gwynt y Môr | June 2015[126] | 576 | 160 | RWE | Construction started January 2012.[127] Final commissioning was completed on 18 June 2015.[126] | 2 | |
Dudgeon | October 2017[128] | 402 | 67 | Equinor and Statkraft | Consent granted July 2012[129] Application for Variation in July 2013 to increase area and reduce capacity.[130] Eligible for UK Government CfD[131] Construction began in March 2016.[132] | 2 | |
Hywind Scotland | October 2017[133] | 30 | 5 | Equinor | Planning application submitted May 2015. Floating wind farm.[134] Planning consented in November 2015.[135] | Demo | |
Blyth Offshore Demonstrator Project | October 2017[136] | 58 | 10 | EDF Renewables | Consent granted.[137] | Demo | |
Race Bank | February 2018[138] | 573 | 91 | Ørsted and Macquarie Group | Consent granted July 2012[139] | 2 | |
Aberdeen Bay (EOWDC) | September 2018[140] | 92 | 11 | Vattenfall | Demonstration site for new turbines. Consent granted March 2013.[141] Project under construction. Use of 8 MW turbines planned utilising the Vestas "short tower" option. | Demo | |
Kincardine (Phase 1) | October 2018 | 2 | 1 | Kincardine Offshore Wind | Consent granted March 2017[142][143][144][145] Commercial scale demonstration of a floating wind farm.[146][147] | Demo | |
Rampion | November 2018[148] | 400 | 116 | RWE, Green Investment Bank, Enbridge | Construction began in January 2016.[4] First electricity delivered to the grid in November 2017.[149] RWE (50.1%) Green Investment Bank (25%) Enbridge (24.9%)[150] | 3 | |
Beatrice | July 2019[151] | 588 | 84 | SSE plc, Copenhagen Infrastructure Partners and Red Rock Power LTD | Offshore pile construction has started.[152] Eligible for government CfD.[131] First power generated in July 2018.[153] Fully operational in June 2019[96] Uses Siemens Gamesa 7 MW turbines. | STW. | |
Hornsea Project One | January 2020[154] | 1218 | 174 | Ørsted, Global Infrastructure Partners | Offshore construction began in January 2018.[155] First power in March 2019.[156] Eligible for government CfD.[131] Use of Siemens Gamesa 7 MW turbines.[156] | 3 | |
East Anglia ONE | July 2020[157] | 714 | 102 | Vattenfall and Scottish Power Renewables | Consent granted June 2014.[158][159] Uses Siemens Gamesa 7 MW turbines. Turbine installation was completed in April 2020.[160] | 3 | |
Kincardine (Phase 2) | August 2021[161] | 48 | 5 | Kincardine Offshore Wind | Consent granted March 2017[142] First turbine towed into place in August 2018 and first power generated in October 2018.[143][144][145] Commercial scale demonstration of a floating wind farm.[146][147] | Demo | |
Moray East | April 2022[162] | 950 | 100 | EDP Renewables, Engie, Diamond Green, China Three Gorges | Consent granted March 2014.[163] Use of Vestas 9.5MW turbines planned. First turbine installed January 2021.[164] EDP Renewables (33.3%), Engie (23.3%), Diamond Green Limited (33.4%) and China Three Gorges (10%)[165] | 3 | |
Triton Knoll | April 2022[70] | 855 | 90 | RWE, J-Power, Kansai Electric Power | Consent granted July 2013[166] Uses Vestas 9.5MW turbines. All foundations completed in August 2020, first power in March 2021.[167][168] RWE (59%), J-Power (24%) and Kansai Electric Power (16%)[69] | 2 | |
Hornsea Project Two | August 2022[169] | 1386 | 165 | Ørsted | Consent granted August 2016 for phase 2 (Breesea & Optimus Wind – 900MW each).[170] Use of Siemens Gamesa 8.4MW turbines. First power in December 2021.[171] | 3 | |
Seagreen (Phase 1) | Q2 2023 (Phase 1)[172][173] | 1140 | 114 | SSE and Total | Consent granted October 2014 for phase 1 (Alpha & Bravo – 525MW each)[68] Successful in the spring 2019 capacity auction.[172] The project is projected to grow to 1,500 MW after phase 1. Vestas 10 MW turbines to be used.[174] First foundation laid October 2021.[175] First power in August 2022. | 3 | |
Dogger Bank A | 2023–24[172][176] | 1235 | 95 | SSE, Equinor, Eni | Consent granted February 2015 for phase 1 (Creyke Beck A & B – 1235MW each)[177] Successful in the spring 2019 capacity auction.[172] The wind farm will use 95 of the GE Haliade-X 13 MW.[178] Equinor (40%), SSE Renewables (40%) and Eni (20%).[179] First foundation laid in July 2022[180] | ||
Neart Na Gaoithe | 2024[181] | 448 | 54 | EDF Renewables, ESB | Consent granted October 2014.[68] Use of Siemens Gamesa 8MW turbines planned. Construction began in August 2020.[182] EDF (50%) and ESB (50%).[183] Delayed until 2024. | STW | |
East Anglia THREE | 2026–27[184] | 1372[184] | 100 | Scottish Power Renewables, Vattenfall and OPR | Consent granted August 2017.[185] Successful ln CFD Round 4[184] Construction started July 2022.[186] | 3 | |
Sofia | 2023–24 (Phase 1),[172] revised completion 2026 | 1400 | 100 | RWE | Consent granted August 2015.[187] Formerly known as Dogger Bank Teesside B. Successful in the spring 2019 capacity auction.[172] Use of Siemens Gamesa 14 MW turbines planned. | 3 | |
Dogger Bank B | 2024–25[172] | 1235 | 95 | SSE, Equinor, Eni | Consent granted February 2015 for phase 1 (Creyke Beck A & B – 1235MW each)[177] Successful in the spring 2019 capacity auction.[172] The wind farm will use 95 of the GE Haliade-X 13 MW.[178] Equinor (40%), SSE Renewables (40%) and Eni (20%).[179] | 3 | |
Dogger Bank C | 2024–25 (Phase 1),[172][188] revised completion 2026 | 1218 | 87 | SSE and Equinor | Formerly known as Teesside A. Consent granted August 2015.[187] Successful in the spring 2019 capacity auction.[172] The wind farm is planning to use the Haliade-X 14 MW from GE, the world's largest wind turbine.[189] | 3 | |
ForthWind Offshore Wind Demonstration Project | 2023–24[172] | 12 | 2 | Cierco | Consent granted December 2016.[190] | ||
Inch Cape | 2026–27[184] | 1080[184] | 72 | Red Rock Power and ESB | Consent granted October 2014.[68] RSPB Judicial Review overturned.[191] Project downsized to 784 MW following issues raised during consultations. New application in August 2018 with fewer but taller turbines.[192] Successful in CFD Round 4[184] | STW | |
Moray West | 2024[193] | 882[194] | 60[194] | EDP Renewables, ENGIE[194] | Consent granted June 2019.[195] Partially successful ln CFD Round 4 for 294 MW of the project[184] | ||
Hornsea Project Three | 2026–27[184] | 2852[184] | 231 | Ørsted | Consent granted in 2020.[196] Final investment decision expected by the end of 2022 and completion by 2027.[197] Successful in CFD Round 4[184] | 3 | |
Dounreay Trì | 2026[198] | 10 | 2 | Hexicon AB and Dounreay Tri | Consent granted March 2017.[199] Has since been put on hold[200] | ||
Hornsea Project Four | 2027 | 180 | Ørsted | Anticipated development consent order is expected to be submitted in 2020.[201] The wind farm is expected to start construction in 2023, and operation at 2027 at the earliest[202] The project's capacity is unknown by Orsted due to the ever increasing size of available wind turbines to the project. | |||
Norfolk Vanguard | Mid 2020s | 1800 | 90–180 | Vattenfall | A development consent order was given for the project in June 2020.[203] The project aims to install all of the offshore cabling for the Vanguard location as well as the sister wind farm, Boreas which is located adjacent to the project.[204] | 3 | |
Norfolk Boreas (Phase 1) | 2026–27[184] | 1396[184] | unknown | Vattenfall | Consent Granted December 2021. Successful in CFD Round 4[184] | ||
Dogger Bank D | 1320 | unknown | SSE and Equinor | Initial surveys started in mid-August and are expected to run until the end of November 2022[205] | |||
Dogger Bank South | 3000 | unknown | RWE | Go ahead to enter lease agreement with Crown Estate July 2022.[206] Survey work complete October 2022.[207] | 4 | ||
Seagreen 1A | 500[208] | 36[208] | SSE and Total | Consent from Scottish Government to increase the capacity of this phase from 360 MW to 500 MW October 2022[208] | |||
Rampion 2 | 2026 | 1200[209] | 90[210] | RWE | RWE is aiming to submit final proposals to the Planning Inspectorate in 2023[210] | ||
North Falls | 2030 | 504[211] | up to 72[211] | RWE | Secured Agreements for Lease with the Crown Estate in 2020[212] | ||
Sheringham Shoal Wind Farm Extension | 719[213] | up to 56[213] | Equinor | Application for Sheringham Shoal Wind Farm Extension submitted[214] | |||
Dudgeon Wind Farm Extension | Shared with Sheringham Shoal | Shared with Sheringham Shoal | Equinor | Application for Dudgeon Offshore Wind Farm Extension submitted[214] | |||
Awel y Môr | 2030[215] | estimated 500 | up to 50[216] | RWE | Applications for a Development Consent Order (DCO) submitted[216] |
The first commercial wind farm was built in 1991 at Delabole in Cornwall;[218] it consisted of 10 turbines each with a capacity to generate a maximum of 400 kW. Following this, the early 1990s saw a small but steady growth with half a dozen farms becoming operational each year; the larger wind farms tended to be built on the hills of Wales, examples being Rhyd-y-Groes, Llandinam, Bryn Titli and Carno. Smaller farms were also appearing on the hills and moors of Northern Ireland and England. The end of 1995 saw the first commercial wind farm in Scotland go into operation at Hagshaw Hill. The late 1990s saw sustained growth as the industry matured. In 2000, the first turbines capable of generating more than 1 MW were installed and the pace of growth started to accelerate as the larger power companies like Scottish Power and Scottish & Southern became increasingly involved in order to meet legal requirements to generate a certain amount of electricity using renewable means (see Renewables obligations below). Wind turbine development continued rapidly and by the mid-2000s 2 MW+ turbines were the norm. In 2007, the German wind turbine producer Enercon installed the first 6 MW model ("E-126"); The nameplate capacity was changed from 6 MW to 7 MW after technical revisions were performed in 2009 and to 7.5 MW in 2010.
Growth continued with bigger farms and larger, more efficient turbines sitting on taller and taller masts. Scotland's sparsely populated, hilly and windy countryside became a popular area for developers and the United Kingdom's first 100 MW+ farm went operational in 2006 at Hadyard Hill in South Ayrshire.[219] 2006 also saw the first use of the 3 MW turbine. In 2008, the largest onshore wind farm in England was completed on Scout Moor[220] and the repowering of the Slieve Rushen Wind Farm created the largest farm in Northern Ireland.[221] In 2009, the largest wind farm in the United Kingdom went live at Whitelee on Eaglesham Moor in Scotland.[222] This is a 539 MW wind farm consisting of 215 turbines. Approval has been granted to build several more 100 MW+ wind farms on hills in Scotland and will feature 3.6 MW turbines.
As of September 2013, there were 458 operational onshore wind farms in the United Kingdom with a total of 6565 MW of nameplate capacity. A further 1564 MW of capacity is currently being constructed, while another 4.8 GW of schemes have planning consent.[30]
In 2009, United Kingdom onshore wind farms generated 7,564 GW·h of electricity; this represents a 2% contribution to the total United Kingdom electricity generation (378.5 TW·h).[223]
Large onshore wind farms are usually directly connected to the National Grid, but smaller wind farms are connected to a regional distribution network, termed "embedded generation". In 2009 nearly half of wind generation capacity was embedded generation, but this is expected to reduce in future years as larger wind farms are built.[224]
Gaining planning permission for onshore wind farms continues to prove difficult, with many schemes stalled in the planning system and a high rate of refusal.[225][226] The RenewableUK (formerly BWEA) figures show that there are approximately 7,000 MW worth of onshore schemes waiting for planning permission. On average, a wind farm planning application takes two years to be considered by a local authority, with an approval rate of 40%. This compares extremely unfavourably with other types of major applications, such as housing, retail outlets and roads, 70% of which are decided within the 13- to 16-week statutory deadline; for wind farms the rate is just 6%.[citation needed] Approximately half of all wind farm planning applications, over 4 GW worth of schemes, have objections from airports and traffic control on account of their impact on radar. In 2008 NATS en Route, the BWEA, the Ministry of Defence and other government departments signed a Memorandum of Understanding seeking to establish a mechanism for resolving objections and funding for more technical research.
Wind farms in the UK often have to meet a maximum height limit of 125 m (410 ft) (excluding Scotland). However, modern lower cost wind turbines installed on the continent are over 200 m (660 ft) tall.[227] This planning criteria has stunted the development of onshore wind in the UK.
Wind farm | County | Country | Turbine model | Power (MW) each turbine |
No. Turbines | Total capacity (MW) |
Commiss- ioned |
Notes and references |
---|---|---|---|---|---|---|---|---|
Crystal Rig | Scottish Borders | Scotland | Nordex N80/ Siemens SWT-2.3 | 2.5/2.3 | 25/60 | 200.5 | May 2004 | Extended May 2007 (1a) & September 2010 (2 & 2a) |
Cefn Croes | Ceredigion | Wales | GE 1.5 se | 1.5 | 39 | 58.5 | June 2005 | |
Black Law | South Lanarkshire | Scotland | Siemens SWT-2.3 | 2.3 | 88 | 124 | September 2005 | Extended September 2006 (Phase 2) |
Hadyard Hill | South Ayrshire | Scotland | Bonus B2300 | 2.5 | 52 | 120 | March 2006 | |
Farr | Highland | Scotland | Bonus B2300 | 2.3 | 40 | 92 | May 2006 | |
Slieve Rushen | Co Fermanagh | Northern Ireland | Vestas V90 | 3 | 18 | 54 | April 2008 | Largest onshore farm in Northern Ireland |
Scout Moor | Lancashire | England | Nordex N80 | 2.5 | 26 | 65 | September 2008 | |
Little Cheyne Court |
Kent | England | Nordex 2.3 | 2.3 | 26 | 59.8 | November 2008 | |
Whitelee | East Renfrewshire | Scotland | Siemens SWT-2.3 | 2.3 | 140 | 322 | November 2008 | Largest operational onshore wind farm in the United Kingdom |
Arecleoch | South Ayrshire | Scotland | Gamesa G87[228] | 2 | 60 | 120 | June 2011 | Construction began October 2008, completed in June 2011[229] |
Griffin | Perth & Kinross | Scotland | Siemens SWT-2.3[230] | 2.3 | 68 | 156.4 | February 2012 | Construction began August 2010, completed in February 2012[231] |
Clyde | South Lanarkshire | Scotland | Siemens SWT-2.3 | 2.3 | 152 | 350 | September 2012 | Construction began January 2010, completed in September 2012[232] |
Fallago Rig | Scottish Borders | Scotland | Vestas V90[233] | 3 | 48 | 144 | April 2013 | Construction finished April 2013[234] |
Whitelee extension |
East Renfrewshire | Scotland | Alstom ECO 100/ECO 74 | 3/1.6 | 69/6 | 217 | April 2013 | Construction finished April 2013[235] |
Keadby Wind Farm | Lincolnshire | England | Vestas V90 | 2 | 34 | 68 | July 2014 | First power produced September 2013, England's largest onshore wind farm, Completed July 2014[236] |
Harestanes | Dumfries & Galloway | Scotland | Gamesa G87 | 2 | 68 | 136 | July 2014 | [237] |
Clashindarroch Wind Farm | Aberdeenshire | Scotland | Senvion MM82 | 2.05 | 18 | 36.9 | March 2015 | Construction began June 2013[238] |
Bhlaraidh | Highland | Scotland | Vestas V112/V117 | 3.45 | 32 | 108 | August 2017 | All 32 turbines connected to the grid.[239] |
Pen y Cymoedd | Neath Port Talbot & Rhondda Cynon Taf | Wales | Siemens SWT-3.0 | 3 | 76 | 228 | September 2017 | Officially opened on 28 September.[240] Largest onshore wind farm in Wales. |
Kilgallioch (Arecleoch Phase 2) |
Dumfries & Galloway | Scotland | Gamesa G90/G114 | 2.5 | 96 | 239 | 2017 | [241] |
Clyde Extension | South Lanarkshire | Scotland | Siemens SWT-3.0 | 3.2 | 54 | 172.8 | 2017 | [242] |
Stronelairg | Highland | Scotland | 3.45 | 66 | 227 | December 2018[243] | Construction started March 2017[244] First power in March 2018.[245] | |
Dorenell | Moray | Scotland | 3 | 59 | 177 | March 2019[246][247] | Last turbine base completed in September 2018.[248] | |
Viking Wind Farm | Shetland Islands | Scotland | 4.3 | 103 | 443 | 2024/2025 | Consent granted April 2012 with reduced number of turbines. Construction started in 2020.[249][250] | |
Stornoway | Western Isles | Scotland | 5? | 36? | 200.00 | 2024/2025 | Consent granted in 2012. First use of 5 MW turbines onshore. Successful in Contracts for Difference Allocation Round 4[251] | |
Muaitheabhal | Western Isles | Scotland | 3.6 | 33 | 189 | estimated 2023/2024 | Halted in October 2014 due to external delays[252] Successful in the spring 2019 capacity auction[172] | |
Hesta Head | Orkney Isles | Scotland | 4.08 | 5 | 20.40 | estimated 2023/2024 | Successful in the spring 2019 capacity auction[172] | |
Druim Leathann | Western Isles | Scotland | 49.50 | estimated 2024/2025 | Successful in the spring 2019 capacity auction[172] | |||
Costa Head | Orkney Isles | Scotland | 4.08 | 4 | 16.32 | estimated 2023/2024 | Successful in the spring 2019 capacity auction[172] | |
Llandinam – Repower | Powys | Wales | 3 | 34 | 102 | Consent granted in 2015. | ||
South Kyle | Dumfries & Galloway | Scotland | Nordex Delta 4000 | 4.8 | 50 | 240 | Consent granted in 2017. Final investment decision to be made by spring 2019.[253] | |
Cumberhead West | Scotland | 119.70 | 2024/2025 | Successful in Contracts for Difference Allocation Round 4[251] | ||||
Stranoch | Scotland | 99.96 | 2024/2025 | Successful in Contracts for Difference Allocation Round 4[251] | ||||
North Kyle Energy Project | Scotland | 212.00 | 2024/2025 | Successful in Contracts for Difference Allocation Round 4[251] | ||||
Chirmorie | Scotland | 81.60 | 2024/2025 | Successful in Contracts for Difference Allocation Round 4[251] |
From 2002 to 2015, windfarms were subsidised through the Renewables Obligation where British electricity suppliers were required by law to provide a proportion of their sales from renewable sources such as wind power or pay a penalty fee. The supplier then received Renewable Obligation Certificates (ROC) for each MW·h of electricity they have purchased.[254] The Energy Act 2008 introduced banded ROCs for different technologies from April 2009. Onshore wind receives 1 ROC per MWh, but since the Renewables Obligation Banding Review in 2009, offshore wind has received 2 ROCs to reflect its higher costs of generation.[255] In Northern Ireland, a banding of 4 ROCs is available for small onshore turbines.[256]
Wind energy received approximately 40% of the total revenue generated by the Renewables Obligation,[257] and ROCs provided over half of the revenue of the wind farms involved.[258] The total annual cost of the Renewables Obligation reached £6.3 billion in 2019–20, of which 67% was for wind power.[259] This cost was added to end-user electricity bills. Sir David King warned that this could increase UK levels of fuel poverty.[260]
The government closed the Renewables Obligation to new onshore wind power projects in 2016.[261] Support for offshore wind was moved into the government's Contract for Difference (CfD) regime.[262] Support for wind power under this programme rose to £1.7 billion in 2020, with £1.6 billion of that total shared between six offshore windfarms.[263]
In 2023 there is an effective windfall tax.[10][264]
The economics of wind power are driven by factors such as the capital, operating and finance costs, as well as the operational performance or capacity factor. These factors are in turn affected by issues such as location, turbine size and spacing and, for offshore windfarms, water depth and distance from shore. Operating costs and performance change over a windfarm's life, and several years of data are required before an assessment of the trajectory of these figures can be made.[265]
A review of financial accounts published by the Renewable Energy Foundation in 2020 showed that UK offshore windfarm capital costs rose steadily from 2002 to around 2013, before stabilising and perhaps falling slightly.[265] Operating costs have risen steadily up to the time of the study, but financing costs have fallen. This picture has been confirmed by a comprehensive review of audited accounts data for UK offshore windfarms, which found that levelised costs rose from around £60–70/MWh for early projects, to around £140–160/MWh by 2010–13, before stabilising.[266]
The Renewable Energy Foundation study also examined onshore wind costs, finding that capital costs had risen to around 2011 before declining slightly thereafter, while operating costs had risen steadily.[265] Estimates of the levelised cost of UK onshore wind are older. A 2011 study by the engineering consultancy Mott MacDonald put onshore wind costs at £83/MWh, below new nuclear at £96/MWh.[267]
In the UK's contract for difference auctions of 2017 and 2019, offshore windfarms made bids to supply the grid at strike prices much lower than anything seen before: £57.50/MWh in the 2017 auction[268] and £39.65/MWh in the 2019 one.[269] These values are below the ostensible windfarm costs outlined in the previous section, and have therefore been widely taken as evidence of a fundamental change in the economics of offshore wind power; in other words that technological advances have led to much lower costs.
There has been no similar reduction in bidding prices from onshore windfarms. The lowest successful bid under the CfD regime has been £79.99/MWh.[270]
The building of UK wind farms has been supported through the Renewables Obligation and, since 2016, by price guarantee support through the Contracts for Difference regime too. The 2018 levelised cost of electricity (LCOE) of offshore wind was in the range £100–150/MWh.[266] However, in recent CfD auctions, strike prices as low as £39.65/MWh have been agreed for offshore wind projects, which has led to an assumption that there has been an equivalent reduction in the underlying costs.[271][272] Due to the structure of the contract for difference arrangements wind generators pay the government when power prices exceed the strike price.[273] Wholesale power prices averaged £57/MWh in 2018 and £113/MWh in 2021 before spiking above £400/MWh in 2022.[274]
Offshore wind has historically been more expensive than onshore wind, but in 2016 it was predicted that it would have the lowest levelised cost of electricity in the United Kingdom in 2020 when a carbon cost was applied to generating technologies.[275]: p25 In the 2022 AR4 CFD auction, offshore wind cleared at an average price of £37.35/MWh versus onshore winds average price of £42.47/MWh (both 2012 prices).[276]
Historically, wind power had raised costs of electricity slightly. In 2015, it was estimated that the use of wind power in the UK had added £18 to the average yearly electricity bill.[277] This was the additional cost to consumers of using wind to generate about 9.3% of the annual total (see table below) – about £2 for each 1%.
A statistical and econometric analysis of a majority of onshore and offshore windfarms built in the United Kingdom since 2002 with a capacity of more than 10MW has been performed by a former professor of the School of Economics at the University of Edinburgh on behalf of an anti wind power organisation. It finds that the actual cost of onshore and offshore wind generation has not fallen significantly. Rather, capital and operating costs per MW have increased, the latter driven by higher than expected frequency of equipment failure and preventative maintenance associated with new generations of larger turbines. The study concludes that, after current contracts guaranteeing above-market prices expire, expected revenues from generation will be less than operating cost. If confirmed, this would require financial regulators to impose heavy risk weightings on loans to offshore wind farm operators, effectively making them too risky for pension funds and small investors.[278]
Surveys of public attitudes across Europe and in many other countries show strong public support for wind power.[11][12][13] About 80 per cent of EU citizens support wind power.[14]
![]() |
A 2003 survey of residents living around Scotland's 10 existing wind farms found high levels of community acceptance and strong support for wind power, with much support from those who lived closest to the wind farms. The results of this survey support those of an earlier Scottish Executive survey 'Public attitudes to the Environment in Scotland 2002', which found that the Scottish public would prefer the majority of their electricity to come from renewables and which rated wind power as the cleanest source of renewable energy.[302] A survey conducted in 2005 showed that 74% of people in Scotland agree that wind farms are necessary to meet current and future energy needs. When people were asked the same question in a Scottish renewables study conducted in 2010, 78% agreed. The increase is significant as there were twice as many wind farms in 2010 as there were in 2005. The 2010 survey also showed that 52% disagreed with the statement that wind farms are "ugly and a blot on the landscape". 59% agreed that wind farms were necessary and that how they looked was unimportant.[15] Scotland is planning to obtain 100% of electricity from renewable sources by 2020.[16]
A British 2015 survey showed 68% support and 10% opposition to onshore wind farms.[303]
In the UK, the ruling Conservative government was previously opposed to further onshore wind turbines and cancelled subsidies for new onshore wind turbines from April 2016.[304] The former prime minister David Cameron stated that "We will halt the spread of onshore wind farms",[305] and claimed that "People are fed up with onshore wind" though polls of public opinion showed the converse.[306] Leo Murray of Possible (formerly 10:10 Climate Action) said, "It looks increasingly absurd that the Conservatives have effectively banned Britain's cheapest source of new power."[307] As the UK's Conservative government was opposed to onshore wind power it attempted to cancel existing subsidies for onshore wind turbines a year early from April 2016, although the House of Lords struck those changes down.[308]
The wind power industry has claimed that the policy will increase electricity prices for consumers as onshore wind is one of the cheapest power technologies,[305] although the government disputes this,[304] and it is estimated that 2,500 turbines will not now be built.[304] Questions have been raised about whether the country will now meet its renewable obligations, as Committee on Climate Change has stated that 25GW of onshore wind may be needed by 2030.[309]
In 2020, the Boris Johnson-led government decided to stop the block on onshore wind power, and since December 2021 onshore wind developers have been able to compete in subsidy auctions with solar power and offshore wind.[310][311] On 24 September 2020, Boris Johnson reaffirmed his commitment to renewables, especially wind power and nuclear in the United Kingdom. He said that the UK can be the "Saudi Arabia of wind power",[312] and that
We've got huge, huge gusts of wind going around the north of our country—Scotland. Quite extraordinary potential we have for wind.[313]
December 2014 was a record breaking month for UK wind power. A total of 3.90 TWh of electricity was generated in the month – supplying 13.9% of the UK's electricity demand.[314] On 19 October 2014, wind power supplied just under 20% of the UK's electrical energy that day. Additionally, as a result of eight of 16 nuclear reactors being offline for maintenance or repair, wind produced more energy than nuclear did that day.[315][316] The week starting 16 December 2013, wind generated a record 783,886 MWh – providing 13% of Britain's total electricity needs that week. And on 21 December, a record daily amount of electricity was produced with 132,812 MWh generated, representing 17% of the nation's total electricity demand on that day.[317]
In January 2018 metered wind power peaked at over 10 GW and contributed up to a peak of 42% of the UK's total electricity supply.[318] In March, maximum wind power generation reached 14 GW, meaning nearly 37% of the nation's electricity was generated by wind power operating at over 70% capacity.[319] On 5 December 2019, maximum wind power generation reached 15.6 GW.[320] At around 2 am on 1 July 2019, wind power was producing 50.64% of the electricity supply, perhaps the first time that over half of the UK's electricity was produced by wind,[321] while at 2:00 am on 8 February 2019, wind power was producing 56.05% of the electricity supply.[322] Wind power first exceeded 16GW on 8 December 2019 during Storm Atiyah.[323]
On Boxing Day 2020, a record 50.67% of energy used in the United Kingdom was generated by wind power. However, it was not the highest daily amount of energy ever generated by wind turbines; that came earlier in December 2020, when demand was higher than on Boxing Day and wind turbines supplied 40% of the energy required by the National Grid (17.3 GW).[324][325] However, on 26 August 2020, wind briefly contributed 59.9% of the grids electricity mix.[326]
In 2022 a new record was set on 24 May with maximum wind power generation reaching 19.916 GW.[327] Then on 2 November wind generation reached 20.896 GW, providing 53% of Britain’s electricity between 12:00pm and 12:30pm.[328]
10 January 2023 saw 21.620 GW of generation, the first time over 21 GW had been produced by wind power in the UK.[329]
As of 2020, there were no major UK-based wind turbine manufacturers: most are headquartered in Denmark, Germany and the USA.
In 2014, Siemens announced plans to build facilities for offshore wind turbines in Kingston upon Hull, England, as Britain's wind power rapidly expands. The new plant was expected to begin producing turbine rotor blades in 2016. By 2019, blades were being shipped in large numbers.[330] The plant and the associated service centre, in Green Port Hull nearby, will employ about 1,000 workers. The facilities will serve the UK market, where the electricity that major power producers generate from wind grew by about 38 per cent in 2013, representing about 6 per cent of total electricity, according to government figures. At the time there were plans to continue to increase Britain's wind-generating capacity, to 14 GW by 2020.[37] In fact, that figure was exceeded in late 2015.
On 16 October 2014, TAG Energy Solutions announced the mothballing and semi closure of its Haverton Hill construction base near Billingham with between 70 and 100 staff redundancies after failing to secure any subsequent work following the order for 16 steel foundations for the Humber Estuary in East Yorkshire.[331]
In June 2016, Global Energy Group announced it had signed a contract in association with Siemens to fabricate and assemble turbines for the Beatrice Wind Farm, at its Nigg Energy Park site. It hopes in the future to become a centre for excellence and has opened a skills academy to help re-train previous offshore workers for green energy projects.[95]
During 2021, £900M were invested in UK offshore wind power manufacturing.[332] The UK offshore wind industry occupied 19,600 people directly in 2021, while thousands others worked in related businesses.[333]
Further information: List of onshore wind farms in the United Kingdom and List of offshore wind farms in the United Kingdom |
Main article: Wind power in Scotland |
Wind power is Scotland's fastest growing renewable energy technology, with 5328 MW of installed capacity as of March 2015. This includes 5131 MW of onshore wind and 197 MW of offshore wind.[334]
Whitelee Wind Farm near Eaglesham, East Renfrewshire is the largest onshore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 MW.[335] Clyde Wind Farm near Abington, South Lanarkshire is the UK's second largest onshore wind farm comprising 152 turbines with a total installed capacity of 350 MW.[336] There are many other large onshore wind farms in Scotland, at various stages of development, including some that are in community ownership.
Robin Rigg Wind Farm in the Solway Firth is Scotland's only commercial-scale, operational offshore wind farm. Completed in 2010, the farm comprises 60 Vestas turbines with a total installed capacity of 180 MW.[337] Scotland is also home to two offshore wind demonstration projects: The two turbine, 10 MW Beatrice Demonstrator Project located in the Moray Firth, has led to construction of the 84 turbine, 588MW Beatrice Wind Farm set to begin in 2017 and the single turbine, 7 MW Fife Energy Park Offshore Demonstration Wind Turbine in the Firth of Forth. There are also several other commercial-scale and demonstration projects in the planning stages.[338]
The siting of turbines is often an issue, but multiple surveys have shown high local community acceptance for wind power in Scotland.[339][340][341] There is further potential for expansion, especially offshore given the high average wind speeds, and a number of large offshore wind farms are planned.
The Scottish Government has achieved its target of generating 50% of Scotland's electricity from renewable energy by 2015, and is hoping to achieve 100% by 2020. Renewables produced 97.4% of Scotland's net electricity in 2020, mostly from wind power.[342]
In July 2017 work commissioning an experimental floating wind farm known as Hywind at Peterhead began. The wind farm is expected to supply power to 20,000 homes. Manufactured by Statoil, the floating turbines can be located in water up to a kilometre deep.[343] In its first two years of operation the facility with five floating wind turbines, giving a total installed capacity of 30 MW, has averaged a capacity factor in excess of 50%[344]
In 2023, through a great increase in profits from six new wind farms, King Charles stated that he would rather see the profits from the wind farms go to support the "wider public good" instead of the profits going to support the royal family.[345]